Similar Projects
Youth Centers
New Construction
Conception
$110,000,000 est. value
Oklahoma City, OK

Fairgrounds Coliseum Construction
New Construction
Conception
$63,000,000 est. value
Oklahoma City, OK

Replace & Upgrade Parking Lots 1 and 2
Term Contract
Design
$500,000 to $1,000,000 est. value
Muskogee, OK 74401

Villa Avenue Bicycle Facility Improvements
Renovation
Design
Oklahoma City, OK 73195

Pedestrian Improvements (Sidewalks) SH-89
Infrastructure
Bidding
OK

Pedestrian Improvements (Trail Construction) Bixby East Fry Trail
Infrastructure
Bidding
OK

Delivery and Installation of 3 Playground Shade Structures at 3 Head Start Centers in Eastern Ok
Renovation, Alteration
Post-Bid
Leflore, Panama, Wilburton, OK 74942

Delivery and Installation of 3 Playground Shade Structures at 3 Head Start Centers in Eastern Ok
Renovation, Alteration
Post-Bid
Leflore, Panama, Wilburton, OK 74942

Pedestrian Improvements (Trail Construction)
Results
OK

Pedestrian Improvements (Trail and School Zone)
Results
Midwest City, OK 73130

Indoor Youth Sports Complex
New Construction
Conception
$11,000,000 est. value
Lawton, OK 73507

Library Sidewalk / 8143 E Reno
Infrastructure
Bidding
Midwest City, OK 73110

Robbers Cave Belle Starr Lodge Renovation
Renovation
Post-Bid
Wilburton, OK

Pedestrian Improvements (Trail Construction)
Results
Yukon, OK 73099

Parking Lot A5 Crack Repair, Seal Coat and Restripe
Infrastructure
Bidding
Norman, OK 73072

Last Updated 03/29/2022 10:56 AM
Project Title

Stillwater Community Center Exterior Ramp and Canopy

Physical Address View project details and contacts
City, State (County) Stillwater, OK 74074   (Payne County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Misc. Recreational, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents