Similar Projects
Sewer Storm Surge Access Assembly
Term Contract
Bidding
Birmingham, AL

MTN Oaks Dr - Drip Rock Ln Comprehensive Rehabilitation
Infrastructure
Bidding
$3,800,000 est. value
Birmingham, AL

2022 On-Call Sewer Services
Infrastructure
Post-Bid
$2,350,000 est. value
Birmingham, AL

2022 AMP07 Sewer Replacement
Infrastructure
Post-Bid
$4,400,000 est. value
Birmingham, AL

Henry Crumpton SSO Abatement
Results
$1,300,000 to $1,600,000 est. value
Birmingham, AL

2021 On-Call Sewer Services
Results
Less than $2,000,000 est. value
Birmingham, AL

Hoover High School PS Comprehensive Rehabilitation
Infrastructure
Post-Bid
$2,000,000 est. value
Hoover, AL 35244

2021 Structural Defect Identification and Replacement
Results
Less than $6,200,000 est. value
Birmingham, AL

2021 AMP01 - Highway 150 I-459 Force Main Renewal
Infrastructure
Post-Bid
$1,400,000 est. value
Birmingham, AL 35249

Swan Creek Trunk Sewer Improvements - Phase 2
Results
$1,364,640 est. value
Birmingham, AL

2022 Sewer Rehabilitation
Infrastructure
Post-Bid
$5,300,000 est. value
Birmingham, AL

Residential Septic Tank Installation and Repair
Results
Birmingham, AL

Sewer Manhole Components
Infrastructure
Post-Bid
Birmingham, AL

Manhole Sewer Covers
Term Contract
Results
Birmingham, AL

Sanitary Sewer System - Asset Management Program
Infrastructure
Post-Bid
$400,000 est. value
Birmingham, AL

Last Updated 05/27/2022 12:48 AM
Project Title

Sanitary Sewer System - Asset Management Program

Physical Address View project details and contacts
City, State (County) Birmingham, AL   (Jefferson County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $13,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Provides for the Open Cut/same Trench Replacement, Parallel Replacement, Pipe Bursting and Trench- Less Installation of Approximately 13,500 Linear Feet of Gravity Sewer and Installation of New or Rehabilitation of Existing Manholes. The Purpose of This Project Is to Increase the Diameter and Capacity of the Sewers to Eliminate Sanitary Sewer Overflows Along the Alignments. Sizes Range From 8-inch to 30-inch With Pipe Material Consisting of Ductile Iron Pipe and Fused Polyvinyl Chloride. The Two Sewer Segments to Be Addressed Are Primarily Located Within City of Mountain Brook and City of Homewood.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents