Similar Projects
Replace Roof Building #27
Alteration
Bidding
$1,000,000 to $5,000,000 est. value
Wilkes-Barre, PA 18702

2022 New Municipal Roof Project Contract
Alteration
Bidding
$400,000 est. value
Wilkes Barre, PA

General Construction Work for Asphalt Shingle Installation - Phase 1
Post-Bid
Tyrone, PA 16686

Roof Replacement with Asbestos Abatement
Post-Bid
Union City, PA 16438

Partial Roof Replacement of the Keystone Middle/Senior High School
Results
Pittsburgh, PA 15216

Roof Replacement Project
Results
Mechanicsburg, PA 17050

Office Roof Replacement
Construction
Mill Hall, PA 17751

Roof Replacement of the Montour Bus Garage
Alteration
Bidding
$80,000 est. value
Pittsburgh, PA 15205

Central Fire Station New Roof Installation
Post-Bid
Uniontown, PA 15401

Roof Replacement Project at Fire Station Nos. 3 and 4
Results
Altoona, PA 16601

Digester No - 2 Roof Repair Project
Alteration
Bidding
$300,000 est. value
York, PA

SCI Mercer - Replace Rubber Roofing
Post-Bid
$900,000 to $1,000,000 est. value
Mercer, PA 16137

Ebensburg Center - Replace Roofing
Results
$1,000,000 to $2,000,000 est. value
Ebensburg, PA 15931

Evergreen Apartments Roof Replacements
Alteration
Bidding
$600,000 est. value
Weatherly, PA 18255

Glen Lyon Roof Replacement Projects
Post-Bid
Glen Lyon, PA 18617

Reported 04/21/2022 12:00 AM
Project Title

Removing, Disposing and Installing a New Roof

Physical Address View project details and contacts
City, State (County) Bloomsburg, PA 17815   (Columbia County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and dispose of approximately 8300 sf of existing metal roofing. 2. Supply and install an ice guard material at the eave and valley locations with the remainder of the roof receiving a synthetic felt vapor barrier. 3. Supply and install a new 24-guage, 15" pan width standing seam roof with a stock color of the customer's choice. 4. Supply and install all necessary trims and closures needed. All trims to be made out of same material as roof (drip edge, rake trim, roof to wall, hip, valley, and peak cap). 5. A ridge vent foam closure will be installed at all peak locations to allow for ventilation. 6. Snow guards. 7. Rain Spouting for two entrances.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents