Similar Projects
1st Avenue South Improvements - 22C02 - City of Naples
Infrastructure
Conception
$6,272,000 CJ est. value
Naples, FL 34102

1st Avenue South Improvements - 22C02 - City of Naples
Infrastructure
Conception
$6,272,000 CJ est. value
Naples, FL 34102

Old Naples Hotel at Third Street Plaza
Demolition, New Construction, Infrastructure - 3,800 SF
Design
$35,000,000 CJ est. value
Naples, FL 34102

Old Naples Hotel at Third Street Plaza
Demolition, New Construction, Infrastructure - 3,800 SF
Design
$35,000,000 CJ est. value
Naples, FL 34102

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Cemetery Parking Lot Paving And Sealing
Alteration
Post-Bid
Immokalee, FL 34142

Tribal Wide Parking Lot(s) Asphalt Patching, Sealing and Striping Services
Term Contract, Alteration
Post-Bid
Clewiston, Hollywood, Immokalee, Okeechobee, Tampa, FL 33610

Randall Boulevard at Everglades Boulevard Intersection Improvements
Results
$1,109,000 est. value
FL 34120

Pavement Maintenance Services
Infrastructure
Results
FL

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Rooms To Go / Naples
New Construction, Infrastructure - 48,641 SF
Construction
$1,500,000 CJ est. value
Naples, FL 34103

St. Matthew's House Renovation
Addition, New Construction, Renovation, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Naples, FL 34112

Arhaus Furniture / Naples
Infrastructure, Renovation
Pending Verification
$100,000 CJ est. value
Naples, FL 34103

Phase II North Beach Outfall Removal & Water Quality Project - 22V26 - City of Naples
Infrastructure
Conception
$15,500,000 CJ est. value
Naples, FL 34102

Last Updated 02/09/2023 01:37 PM
Project Title

Resurfacing - SR 90 (US 41)

Physical Address View project details and contacts
City, State (County) Ochopee, FL 34141   (Collier County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $3,477,042 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Counties: Collier Road Name: Sr 90 (Us 41) Limits: From E of Whistler's Cove Blvd to W of Collier Blvd Project(s): 44156115201(*) Federal Aid No: D122011B Total Roadway Length: 1.405 Miles Contract Days: 200 Total Bridge Length: 0.000 Miles Total Proposal Length: 1.405 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Days (Aqui Time) The improvements under this contract consist of milling and resurfacing, base work, shoulder treatment, drainage improvements, curb and gutter, sidewalk, traffic signals, lighting and signing and pavement markings on State Road 90 (US 41) from east of Whistler's Cove Boulevard to west of Collier Boulevard, in Collier County. Contractors must have a current certificate of qualification in accordance with Florida Statute 337.14(1) and Rule Chapter 14-22, Florida Administrative Code, on the date of the letting to bid on construction projects over $250,000.00 as established by the Department's budget. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 001 Resurfacing - SR 90 (US 41)

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents