Similar Projects
ADA Curb Ramp Improvements and Trail Extension - Region 2
Infrastructure
Bidding
$794,000 est. value
Bowdoinham, ME

Driveway Replacement and Lighting
Infrastructure
Bidding
$375,000 to $425,000 est. value
Waterville, ME

Sidewalk Construction Route 27 in the Municipalities of Boothbay and Boothbay Harbor
Post-Bid
$565,000 est. value
Boothbay, Boothbay Harbor, ME 04537

Windham Middle School SRRF Exterior ADA Access Upgrade
Post-Bid
Windham, ME 04062

Muskie Parking Lot Paving
Results
$500,000 to $800,000 est. value
Augusta, ME 04330

Waterfront Parking Lot Improvements
Results
Less than $1,159,000 est. value
Damariscotta, ME 04543

ADA Curb Ramp Improvements - Hebron, Madison, Paris, West Paris - Region 3
Infrastructure
Bidding
$114,000 est. value
Hebron, Madison, Paris, West Paris, ME

Windham Middle School SRRF Interior ADA Improvements
Post-Bid
Windham, ME 04062

South and Crescent Street Sidewalk Reconstruction Project
Results
Biddeford, ME

Quarry Road Trails Single Track Enhancements
Infrastructure
Post-Bid
Waterville, ME 04901

Installation of Lift Gates, Installation of Fencing, and Parking Lot Improvements for The US Custom & Border Protection In Hodgdon, Me
Results
$200,000 to $400,000 est. value
Hodgden, ME

Clifford Park Black Trail Repair
Infrastructure
Post-Bid
Biddeford, ME 04005

Howard and Shawmut Street Sidewalk Reconstruction
Results
Lewiston, ME 04240

Landscape Paver Services for the Penobscot Job Corps Center
Infrastructure
Post-Bid
Bangor, ME 04401

Shaker Road Sidewalk and Drainage Improvements Project
Results
Gray, ME 04039

Reported 05/14/2022 12:58 AM
Project Title

Continental Mill Riverwalk Path

Physical Address View project details and contacts
City, State (County) Lewiston, ME   (Androscoggin County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2025
Bids Due View project details and contacts
Estimated Value $391,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a walking path along the Androscoggin River by the Continental Mill site and crossing Cross Canal #3, through the Museum LA site connecting to Simard-Payne Park. A new bridge over Cross Canal 3 is included in this project. This is extending the Riverwalk Trail System that includes the John Jenkins trestle bridge over the Androscoggin River to Auburn. It will provide a critical connection between Cedar St./Raymond Park and Simard-Payne Park.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents