Similar Projects
Last Updated | 04/24/2020 12:44 AM |
Project Title | Westover Middle School Cooling Tower Replacement |
Physical Address | View project details and contacts |
City, State (County) | Fayetteville, NC 28303 (Cumberland County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Delta Pioneer cooling tower requires a flat surface to mount the base. The Contractor shall make a steel platform with a steel 1/4 inch plate measuring no less than 72 inches wide and no less than 118 inches long wlded to steel ibeams. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |