Similar Projects
Margaret Pollard Expansion - Chatham County
Addition, Demolition, Infrastructure
Conception
$400,000 CJ est. value
Chapel Hill, NC 27516

Sportsplex - Ice Rink - Orange County
Infrastructure
Conception
$875,000 CJ est. value
Hillsborough, NC 27278

ArtsCenter
Renovation, Infrastructure - 17,864 SF
Design
$3,000,000 CJ est. value
Carrboro, NC 27510

Murray Hill at Meadowmont - Buildings 3 and 4
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Chapel Hill, NC 27517

Odie Street
Infrastructure
Post-Bid
Hillsborough, NC

West Rosemary Street Office and Apartments
Demolition, New Construction, Infrastructure - 4,034 SF
Post-Bid
$1,500,000 CJ est. value
Chapel Hill, NC 27516

Town-Wide Sidewalk Saw Cutting Project
Infrastructure
Results
$68,762 est. value
Chapel Hill, NC 27516

Nc 49 from Alamance County Line to Nc 86 and Six Secondary Roads
Infrastructure
Results
NC

The 203 Project / Carrboro - BP500 Prequalification
New Construction, Infrastructure
Construction
$26,071,297 CJ est. value
Carrboro, NC 27510

AURA Chapel Hill
New Construction, Infrastructure - 410,947 SF
Construction
$100,000,000 CJ est. value
Chapel Hill, NC 27514

Greensboro Street Mixed-Use Development
New Construction, Infrastructure - 16,186 SF
Pending Verification
$10,000,000 CJ est. value
Carrboro, NC 27510

Residence Inn and Summit Place Townhomes
Addition, New Construction, Infrastructure
Pending Verification
$32,000,000 CJ est. value
Chapel Hill, NC 27514

1200 MLK Redevelopment
Demolition, New Construction, Infrastructure - 111,680 SF
Design
$12,000,000 CJ est. value
Chapel Hill, NC 27514

Homestead Gardens Multi-Residential Development
New Construction, Infrastructure
Post-Bid
$35,000,000 CJ est. value
Chapel Hill, NC 27516

Ast Retreatment of Thirty Two Secondary Roads
Infrastructure
Results
NC

Last Updated 05/05/2023 03:34 PM
Project Title

Blackwood Farm Park - 20037 - Orange County

Physical Address View project details and contacts
City, State (County) Hillsborough, NC 27516   (Orange County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $775,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Blackwood Farm Park is a 152-acre regional park between Chapel Hill and Hillsborough on NC 86 and New Hope Church Road. The park opened on a limited basis in June 2015 and is currently open Thursday-Sunday. Phase 2 of the park is nearing completion and should be open in April 2023, including construction of new infrastructure and turn lanes, entryway and parking, new picnic shelter, restrooms, amphitheater, repairs and renovations to the farmstead, and park ranger station. Once opened, the park is projected to move to a seven day per week schedule. Planning and design for a disc golf course is currently underway and may be completed in 2024. Farmstead repairs are also underway and continuing, including the historic farmhouse, which will become part of the park amenities. Funding of $775,000 in FY2023-24 includes Phase 3 park construction including the New Hope Church Road overlook and an additional picnic shelter/barn that will double as an outdoor classroom and farm implement storage as a bridge to the future Nature Center. As of May 5, 2023, this project is included in Orange County's FY 2023-33 CIP and funding is allocated for FY 2023-24. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents