Similar Projects
Bituminous and Concrete Patching of Sidewalks and Roadways
Infrastructure
Bidding
$80,000 est. value
Pawtucket, RI

Parcel 25 Temporary Parking Lot Restoration
Post-Bid
Providence, RI 02903

Construction Services for City Wide 50/50 Sidewalk Program
Post-Bid
Pawtucket, RI

Sylvian Street Infrastructure and Streetscape Improvements
Results
Central Falls, RI

Infrastructure and Streetscape Improvements to Improve Residents' Access to Commuter Rail Station and Bus Hub
Results
Central Falls, RI

Blackstone River Bikeway
Post-Bid
Central Falls, RI 02863

HSIP Intersection Safety Improvements Route 37 and Natick Avenue
Results
Providence, RI 02908

Integrally Colored and Stamepd Concrete Sidewalk/Steps/Patio
Post-Bid
Providence, RI

Granite Curbing
Term Contract
Results
Woonsocket, RI

Tunnel Pump Station Lot Crack Repairs
Post-Bid
Providence, RI 02905

Installation of Portland Concrete Cement Sidewalks
Term Contract
Results
Woonsocket, RI

Sylvian Street Infrastructure and Streetscape Improvements
Infrastructure
Post-Bid
Central Falls, RI 02863

RI College Parking Lot D Renovations
Results
Providence, RI 02908

Sidewalk, Road, and Drainage Construction
Infrastructure
Post-Bid
Central Falls, RI

Citywide Sidewalk Improvements
Results
East Providence, RI

Last Updated 04/29/2022 04:01 AM
Project Title

Installation Of Portland Cement Concrete Sidewalks

Physical Address View project details and contacts
City, State (County) Woonsocket, RI   (Providence County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Saw cut all edges of the required work area. Excavate existing earth, asphalt concrete, cement concrete and or rock, install forms as necessary and install new portland cement concrete sidewalks as directed. Excavate existing asphalt concrete temporary patches 6 SY or less at completed City utility installations, excavate additonal existing cement concrete and install new portland cement concrete sidewalks as directed. Excavate additional unsuitable material below sub-grade and refill with suitable gravel bedding material. Remove and reset existing granite or pre-cast concrete curbing.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents