Similar Projects
New Gym Floor Demo and Replacement at The Englewood Campus
Bidding
CO

Secondary Building Gymnasium Floor Refinishing
Bidding
Dove Creek, CO

ACC DQ 20-6-1018 Carpet Replacement (Tandus)
Post-Bid
Colorado Springs, CO

Lowry Classroom Flooring
Post-Bid
Aurora, CO

CU South 1st Great Hall Renovation Paint / Carpet
Results
Less than $50,000 est. value
Aurora, CO 80045

Mercury Removal Services Package 02
Results
Colorado Springs, CO 80905

Grand Junction Regional Airport Flooring Replacement
Construction
Grand Junction, CO 81501

Summit Hall 4th Floor Corridor Flooring
Bidding
Fort Collins, CO 80521

Wood Floor & Carpet Cleaning And Maintenance
Post-Bid
Lone Tree, CO

Mercury Removal Services Package 01
Results
Colorado Springs, CO 80905

NRRC-D Building Carpet Replacement
Bidding
Fort Collins, CO 80526

1161 Transit Drive - Floor Leveling
Post-Bid
Colorado Springs, CO 80903

CTCF Kitchen Floor Replacement
Results
$750,000 est. value
Colorado Springs, CO

Carpet Removal and Installation
Term Contract
Bidding
Brighton, CO

Golf Course Restroom Tile Projects
Post-Bid
Denver, CO 80202

Reported 08/15/2020 12:00 AM
Project Title

Cardio Equipment and Flooring

Physical Address View project details and contacts
City, State (County) Firestone, CO   (Weld County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this bid process is to secure an agreement for a contractor to provide cardio equipment and flooring to include removal, preparation, placement, and installation of equipment and flooring along with all warranties for the Carbon Valley Parks and Recreation District (CVPRD) Recreation Center. The most up to date and highest quality materials are imperative to the maintenance of our Fitness Department. Submitting parties must be able to commit the resources necessary to provide the products in a timely manner. The successful Vendor shall be required to furnish the material, products and/or equipment identified in these Specifications as well as to set in place or install these materials, products and/or equipment designated by CVPRD. Accordingly, the Vendor shall include all costs associated with installation in its proposed unit cost to CVPRD.

Details

Division 09 - Finishes, Flooring.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents