Similar Projects
Glenvale Topsham Meadow Solar
New Construction, Infrastructure
Conception
$20,000,000 CJ est. value
Topsham, ME 04086

Central Maine Medical Center Ambulatory / Outpatient Surgery Center
New Construction, Infrastructure - 20,000 SF
Conception
$14,000,000 CJ est. value
Topsham, ME 04086

Topsham Lewiston Solar Power Generation
Infrastructure
Design
$2,000,000 CJ est. value
Topsham, ME 04086

$UPDATE PRESS - Mount Ararat High School - Arthur C. Dudley Construction
New Construction, Infrastructure
Design
$60,000,000 CJ est. value
Topsham, ME 04086

Arrowsic/Woolwich Max L. Wilder Memorial Bridge #2026 2023
Infrastructure
Bidding
$600,000 CJ est. value
Arrowsic, ME 04530

Arrowsic/Woolwich Max L. Wilder Memorial Bridge #2026 2023
Infrastructure
Bidding
$600,000 CJ est. value
Arrowsic, ME 04530

Richmond Maintenance Facility Buildings
New Construction, Infrastructure - 4,000 SF
Post-Bid
$500,000 est. value
Richmond, ME 04357

Richmond Maintenance Facility Buildings
New Construction, Infrastructure - 4,000 SF
Post-Bid
$500,000 est. value
Richmond, ME 04357

Salt Storage Dome Inspection and Repair
Renovation
Results

Statewide Geotechnical Drilling
Infrastructure
Results

The Sidewalk Rehabilitation Project
Infrastructure
Construction
$299,720 CJ est. value
Bath, ME 04530

The Sidewalk Rehabilitation Project
Infrastructure
Construction
$299,720 CJ est. value
Bath, ME 04530

Eagle River Subdivision Phase 2
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Topsham, ME 04086

The Uptown
New Construction, Infrastructure, Renovation
Pending Verification
$17,000,000 CJ est. value
Bath, ME 04530

Frank J Wood Bridge - Maine Department Of Transportation
Demolition, New Construction, Infrastructure
Design
$17,000,000 CJ est. value
Topsham, ME 04086

Last Updated 09/27/2023 12:28 PM
Project Title

Compass Lane Self Storage

Physical Address View project details and contacts
City, State (County) Topsham, ME 04086   (Sagadahoc County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Site Development, Warehouse/Storage
Contracting Method Bids by Invitation
Project Status Construction Nearing Completion, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 27, 2023, construction is underway. Details regarding design build team were not disclosed.

Details

16,400 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents