Similar Projects
Last Updated | 11/02/2022 03:08 AM |
Project Title | Pool Filter Media Repair |
Physical Address | View project details and contacts |
City, State (County) | New Orleans, LA 70117 (Orleans County) |
Category(s) | Single Trades |
Sub-Category(s) | Equipment |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $9,496 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | *This Event i replacing Event 2261* The contractor shall provide all labor, materials, tools, equipment, facilities, supervision, management, financing, services, shop drawings, submittals, testing, and other items necessary for the proper execution and functioning and shall make all installations and connections necessary, specified, customary, or otherwise appropriate to perform fully and to complete in every respect the contract work generally described as follows: (Specification or drawing references included in the following statement of Subcontract work are applicable but not necessarily all inclusive Sanchez Pool - 1616 Caffin New Orleans, LA 70117: Remove and replace all filters media Filter Media #20 Silica - 50 lb bag - 106 count Filter Media 8-16 Gravel - 50 lb bag - 50 count - Vacuum Disposal - 1 count - Waterco Dual Pressure Gauge Panel - 1 count Remove all debris and dispose off site. Repair any damage caused to site during work performed. All materials, equipment, supplies, fasteners, and other items required to perform work tasks to be supplied and installed by contractor. All trash and debris to be removed by contractor and hauled off. Do not use City dumpster. Clean area when work is complete. Area lo be ready for business use when finished. If any equipment is found to be defective ii is to be identified lo owner for approval of repair/replacement. All material shall conform to the latest issue of all applicable standards established by NEMA, and underwriters laboratories, inc. and shall bear manufacturer ' s trade and brand name. All work shall be installed and completed with the latest rules and regulations of the ASME, NFPA,NEC and all State and local codes and standards and such work not so installed shall be removed and reinstalled at the Contractor's expense Warranties on all furnished equipment and industry standards on parts and labor, all manufactures warranties should apply. Personal Protective Equipment to be worn at all times and a safe working environment is to be maintained. Q and a open: June 30, 2022 7:45:00 PM Q and a close: July 7, 2022 7:45:00 PM |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |