Similar Projects
PS1 24" Forcemain - Construction - 22A01 - North Shore Water Reclamation District
Infrastructure
Conception
Less than $5,368,000 est. value
Gurnee, IL

Water Reclamation Air Lifts - 22R03 - North Shore Water Reclamation District
Renovation
Conception
$3,025,300 est. value
Gurnee, IL 60031

Floor Drain Piping Project
Infrastructure
Bidding
$2,400,000 est. value
Waukegan, IL

Forest Park Bluff Stabilization
Renovation, Infrastructure
Bidding
$500,000 est. value
Lake Forest, IL

Viking Park Drainage Maintenance
Post-Bid
Gurnee, IL

Sunrise Park and Beach Access Improvements
Renovation
Post-Bid
Lake Bluff, IL 60044

2020 Storm Water Improvements
Results
Less than $633,525 est. value
Deer Park, IL

2021 Stormwater Improvements
Results
Less than $550,000 est. value
Deer Park, IL

Midwest Industrial - Village of Libertyville
Addition, Build-Out - 480,580 SF
Pending Verification
Libertyville, IL 60048

Clarifier Collection Systems - 18R01 - North Shore Water Reclamation District
Demolition, Alteration
Conception
$3,799,400 est. value
Gurnee, IL

Blumberg Park
Renovation
Post-Bid
Less than $2,000,000 est. value
Deerfield, IL 60015

2021 Tennis Court Improvements
Results
Grayslake, IL

North Park Tennis/Pickelball Court
Post-Bid
Lincolnshire, IL

Drainage Improvements
Renovation
Results
Grayslake, IL

2021 Road Program Forest Knoll Drainage Improvements
Post-Bid
Libertyville, IL

Last Updated 06/24/2022 12:55 AM
Project Title

Mass Grading to Construct a Flood Storage Detention Basin

Physical Address View project details and contacts
City, State (County) Libertyville, IL 60048   (Lake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Park/Playground, Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,250,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mass grading to construct a flood storage detention basin, storm sewer and underdrain installation, construction of both PCC and HMA paths, softball field and amenity construction, and all necessary restoration.

Details

Division 03 - Concrete, Precast Concrete.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents