Similar Projects
Improvements To The Highway Department Well - Lime Addition and Emergency Generator
Infrastructure, Alteration
Bidding
$850,000 est. value
Bishopville, SC 29010

Valley Public Service Authority Addition of Water Transmission Line and Dixie Clay Well Water Treatment System
Infrastructure
Bidding
Warrenville, SC 29851

Repair Submersible Pump
Post-Bid
Florence, SC 2906

CWS Plum Island PCPS Pump Base Plate Fabrication Project
Post-Bid
Charleston, SC 29402

Highway 38 Well and Treatment Plant
Results
Bennettsville, SC

Well Abandonment at UST Sites
Term Contract
Results
Columbia, SC 29201

Installation of Residential Wells
Infrastructure
Bidding
SC

Gas Powered Fish Pump
Post-Bid
Columbia, SC

Googe Street Well Replacement
Results
Allendale, SC

Bluffton 4 & 6 Well House Rehabilitation
Infrastructure
Bidding
Beaufort, SC

Hwy 38 Well & Treatment Plant
Post-Bid
SC

Construction of TTHM Reduction
Results
Saluda, SC 29138

North Charleston Convention Center Heating Pumps Replacement
Post-Bid
North Charleston, SC

Deerfield ASR Well House Construction
New Construction
Results
Myrtle Beach, SC 29575

Irrigation Pump for Cane Bay High School
Post-Bid
Summerville, SC 29486

Last Updated 01/10/2022 12:47 AM
Project Title

Kings Mountain Equestrian Campground Test Well 2

Physical Address View project details and contacts
City, State (County) Blacksburg, SC   (Cherokee County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $15,000 to $25,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a test well for water service to equestrian campsites. Water sampling and wellhead development report as part of test well construction.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents