Similar Projects
Police Department Parking Lot Drainage Improvements
Post-Bid
Bayville, NJ 08721

Bulkhead Reconstruction- Boston Avenue
Post-Bid
Point Pleasant Beach, NJ 08742

Curtis Avenue Drainage Improvements
Results
Point Pleasant Beach, NJ 08742

2019 Various Drainage Improvements
Results
Berkeley, NJ 08721

Lake Riviera- Rainbow Dam Culvert Replacement and Embankment Restoration
Results
$177,820 est. value
Brick, NJ 08723

2019 Various Bulkhead Improvements
Results
Berkeley, NJ

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Isolated Drainage and Roadway Improvements
Results
Brick, NJ 08723

2020 Bulkhead Replacement Project - Pearl Street and Norwood Avenue
Results
Beach Haven, NJ 08008

Adamston Area Roadway Improvements
Results
Brick, NJ 08723

Tuckerton Revetment Project
Results
$320,000 est. value
Tuckerton, NJ 08087

Ocean Acres Playground Drainage Improvements
Results
Manahawkin, NJ 08050

2019 Various Road and Drainage Reconstruction
Results
Beachwood, NJ 08722

Isolated Drainage and Roadway Improvements
Results
Brick, NJ 08723

Drainage Restoration Contract, Statewide -2019
Results
$5,000,001 to $10,000,000 est. value

Last Updated 05/11/2021 09:49 AM
Project Title

2021 Dune Repair Project

Physical Address View project details and contacts
City, State (County) Toms River, NJ   (Ocean County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The base contract portion of this project is for the import and placement of sand to re-construct the 10:1 easterly slope of the dune from 4th Ave to Fielder Avenue in Ortley Beach. The contractor shall also grade the sand at each existing walkover as per the original ACoE plan - see provided. The base contract also includes installation and removal of construction access points at the existing vehicular entrance points at the 3rd Ave parking lot and/or Harding Ave. No other access over or through the dune is permitted to preserve vegetation.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents