Similar Projects
Bird Creek Detention Pond - City of Temple
Infrastructure
Conception
$3,043,000 est. value
Temple, TX

Little Elm Trunk Sewer North East Extension - City of Temple
Infrastructure
Conception
$1,400,000 est. value
Seaton, TX 76501

AMFR Service and Tire Station
New Construction, Infrastructure - 4,080 SF
Design
$400,000 CJ est. value
Harker Heights, TX 76548

Rios Plaza
New Construction, Infrastructure - 10,525 SF
Design
$1,500,000 CJ est. value
Harker Heights, TX 76548

Battalion Headquarters Building with Classrooms
New Construction, Infrastructure
Bidding
$25,000,000 CJ est. value
Killeen, TX 76540

Battalion Headquarters Building with Classrooms
New Construction, Infrastructure
Bidding
$25,000,000 CJ est. value
Killeen, TX 76540

Communication Infrastructure Upgrade
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Fort Hood, TX 76544

US 290 - Crack Seal
Infrastructure
Sub-Bidding
$158,148 CJ est. value
Elgin, TX 78621

HEB - Turn Lane Improvements
Post-Bid
San Antonio, TX

Construction Bids for Approximately 3,200-Feet of 12-Inch Water Main Near Toutant Beauregard Road and Future Scenic Crest Blvd
Post-Bid
San Antonio, TX 78249

Hanks Creek Water System Extension
Results
$395,000 est. value
Huntington, TX 75949

Closed Loop Systems Water Treatment
Results
San Antonio, TX

Knob Creek Basin Wastewater Projects
Infrastructure
Pending Verification
$28,930,000 est. value
Temple, TX

Line 204 Studios-Stage B
New Construction, Infrastructure - 25,597 SF
Pending Verification
$8,000,000 CJ est. value
Bastrop, TX 78602

NW 36 Transmission Main (WTP to SH 317) - City of Temple
Infrastructure
Conception
$81,000,000 est. value
Temple, TX 76501

Last Updated 08/04/2022 09:04 AM
Project Title

Construction of Sanitary Sewer Facilities for LongLeaf Lift Station Phase 1

Physical Address View project details and contacts
City, State (County) Lumberton, TX 77657   (Hardin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $310,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

B-E Development, Inc. on behalf of Lumberton Muncipal Utility District (Owner) is requesting bids for the construction of the following Project: Construction of Sanitary Sewer Facilities for LongLeaf Lift Station Phase 1 610.075.008.00. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents obtained from sources other than the designated website. Bid must be accompanied by a Bid Bond or a certified or cashier's check, in an amount not less than five percent (5%) of the total amount Bid, as a guarantee that the successful bidder will enter into the Contract and execute the Bonds on the forms provided. Bidder must submit its Bid and bid securities in compliance with Owner's Order Adopting Section 49.2731 Electronic Bidding Rules and all Bids and bid securities must be submitted through website. Bidder must register on this website in order to submit a Bid and bid security. By submitting a Bid, Bidder acknowledges and agrees that the Contract Documents may be accepted, executed, or agreed to through the use of an Electronic Signature, as defined by and in accordance with the Owner's Electronic Signature Rules for Construction Contracts. The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in the bidding or bidding process except the time of submitting a Bid. The Successful Bidder, if any, will be the responsible Bidder which, in the Owner's judgment, will be most advantageous and result in the best and most economical completion of the Project. (Texas Water Code 49.273) The requirements of Subchapter J, Chapter 552, Government Code, may apply to this Bid and/or Contract and the Contractor agrees that the Contract can be terminated if the Contractor knowingly or intentionally fails to comply with a requirement of that subchapter.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents