Similar Projects
Office/Warehouse
New Construction - 5,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
McDonough, GA 30253

Little Ridge Road Warehouse and Distribution Building
New Construction - 151,200 SF
Conception
$10,000,000 CJ est. value
Acworth, GA 30102

Knox Campground Mini-Warehouses and Retail
New Construction - 1,500 SF
Design
Canton, GA 30114

Cherokee Storage
New Construction - 23,850 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Canton, GA 30115

Public Works Maintenance New Shop Addition #2
New Construction
Bidding
Valdosta, GA

PCS West Property Development
New Construction
Bidding
Garden City, Port Wentworth, GA 31407

Fulton Industrial Phase II
New Construction - 422,240 SF
Post-Bid
$10,000,000 CJ est. value
Atlanta, GA 31136

Cumming Distribution Shop Design Build
Renovation
Post-Bid
Less than $2,000,000 est. value
Cumming, GA 30040

Project No Knot
Results
GA

Pre-Engineered Metal Buildings
Results
Monroe, GA 30655

Fairburn Road Storage
Renovation - 75,600 SF
Construction
$977,600 est. value
Atlanta, GA 30331

Gwinnett Climate Controlled Self Storage
Addition - 40,000 SF
Construction
$2,200,000 est. value
Lilburn, GA 30047

Empire Roofing
Renovation - 1,609 SF
Pending Verification
Atlanta, GA 30326

Storage
New Construction - 20,910 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Macon, GA 31210

Connect Metal Recycling
New Construction - 54,400 SF
Conception
Norcross, GA

Last Updated 02/17/2022 03:28 PM
Project Title

Greenwood 75 Logistics Center

Physical Address View project details and contacts
City, State (County) McDonough, GA 30248   (Henry County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method
Project Status Construction Commenced February 2021, Construction Complete as of February 2022
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Warehouse/Storage, 1 Story Above Grade, 1,001,700 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents