Similar Projects
Last Updated | 02/22/2021 09:32 AM |
Project Title | Enslow Boulevard Erosion Repair |
Physical Address | View project details and contacts |
City, State (County) | Huntington, WV (Cabell County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Install approximately 119 feet of riprap armoring along the existing streambank on Fourpole Creek that is adjacent to Enslow Boulevard. The project will stabilize the streambank side-slope and prevent further streambank erosion that will potentially damage the adjacent roadway. The bottom of the existing channel will not be raised ant the existing streambed and cross sections upstream and downstream will not be modified. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |