Similar Projects
Y--Design-Build: Lahontan NFH Well Replacement
Results
$1,000,000 to $5,000,000 est. value
Gardnerville, NV

Deep And Shallow Sonic Monitoring Wells - Truckee Meadows Water Authority
Results
Reno, NV 89502

Well J8 Equipping
Results
$757,000 est. value
Las Vegas, NV

Well Number 36
Results
$2,830,260 est. value
Mesquite, NV 89024

Well Assessments
Post-Bid
Owyhee, NV

Well Drilling
Post-Bid
NV

6" Diameter Mud-Rotary Monitoring Wells
Results
$454,500 to $555,500 est. value
Reno, NV

Confined Space Pump and Motor Repair Services
Infrastructure
Results
Las Vegas, NV

General Pump Repair Services Countywide
Term Contract
Results
Las Vegas, NV

Kietzke and Morrill Wells-Phase 2 Improvements
Infrastructure
Results
$215,000 est. value
Reno, NV

AMS Backwash Pump Replacement
Infrastructure
Results
Las Vegas, NV

Fish Springs Ranch Wells A, B, and E Drainage Improvements
Infrastructure
Results
$301,310 est. value
Reno, NV

Production Well Rehabilitation
Infrastructure
Results
$230,769 to $282,051 est. value
Reno, NV

Last Updated 12/03/2021 08:36 AM
Project Title

Spanish Springs 6-Inch Test Wells

Physical Address View project details and contacts
City, State (County) Sparks, NV 89441   (Washoe County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $252,000 to $308,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

All labor, materials, transportation, tools, supplies and appurtenances, and incidentals to drill, construct, and develop two (2) six-inch (6") diameter 0.188-wall mild steel monitoring wells up to 800 feet deep each. This project consists of drilling and constructing two (2) monitoring wells utilizing mud rotary or approved equivalent drilling method. The site is located approximately 15 miles northeast of Reno. The project may be stopped at any time during monitoring well drilling if geologic conditions are found to be insufficient for monitoring well purposes.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents