Similar Projects
MCC Chicago - Replace Rooftop Rec
Bidding
$250,000 to $500,000 est. value
Chicago, IL 60605

Roof Sealing at Activity Center
Alteration
Bidding
Troy, IL 62294

On Call Roofing Repair Services
Term Contract
Post-Bid
West Chicago, IL 60185

Roofing Systems, Exterior Building Maintenance
Term Contract
Post-Bid

Roof Replacement at Building L
Results
Glen Ellyn, IL 60137

Multiple Roof Replacement
Renovation
Results
Rantoul, IL 61866

Roof Replacements
Renovation
Pending Verification
$144,143 est. value
Champaign, IL 61821

Ellwood Carriage House Roof Replacement
Alteration
Bidding
Dekalb, IL 60115

2021 Roof Replacement at Arbor Park MS
Post-Bid
Oak Park, Tinley Park, IL 60477

NEIU Replace Campus Roofs
Results
Less than $4,000,000 est. value
Chicago, IL 60625

Roof Overlay For West Tertiary Building
Alteration
Bidding
IL

Buffalo Rock State Park - Roof Replacement Completion
Post-Bid
Springfield, IL

Recreation Center Roof Improvements
Results
Highland Park, IL 60035

Housing Rehabilitation Program - Roof, Sidewalk, and Porch
Renovation
Bidding
Rock Island, IL 61201

2021 Roof Repairs at Heritage Middle School
Post-Bid
Berwyn, IL 60402

Last Updated 06/08/2021 03:05 PM
Project Title

Roof Replacement - Phase 3 - Flora High School

Physical Address View project details and contacts
City, State (County) Flora, IL 62839   (Clay County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work covered under this project consists of approximately 13,134 square feet of roof replacement. Demolition work includes removal and disposal of existing EPDM roofing membrane system and insulation down to the existing roof deck to remain including: associated gutters, copings, wood blocking, sheet metal trim/flashing, temporary removal of mechanical equipment, and other miscellaneous associated roof items. New work consists of new EPDM membrane system over new cover board, insulation and base sheet, new wood blocking, new sheet metal flashing, gutters and downspouts and re-installation of mechanical equipment as well as other associated roof items.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Sheathing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting, Exterior Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents