Similar Projects
Air Park Recreation Center Replacement Facility - City of Lincoln
Addition, Infrastructure
Conception
$933,182 CJ est. value
Lincoln, NE 68524

Multi Modal Center - City of Lincoln
New Construction, Infrastructure
Conception
$528,979 CJ est. value
Lincoln, NE 68508

Compressed Natural Gas (CNG) Fueling Station
New Construction, Infrastructure
Design
$4,481,919 CJ est. value
Lincoln, NE 68508

Monolith Materials Anhydrous Ammonia Plant - Phase 2
Addition, Demolition, Renovation, Infrastructure
Design
$1,000,000,000 CJ est. value
Hallam, NE 68368

Emerald View Apartments - Phase 1
New Construction, Infrastructure
Bidding
$30,000,000 CJ est. value
Yankee Hill, NE 68523

Salt Valley 48-Inch Corrugated Metal Pipe (CMP) Rehabilitation
Infrastructure
Bidding
$51,000 CJ est. value
Lincoln, NE 68508

Residence Inn / Lincoln
New Construction, Infrastructure - 83,000 SF
Sub-Bidding
$25,000,000 CJ est. value
Lincoln, NE 68508

Arnold Heights Concrete - 2022
Infrastructure
Post-Bid
$30,000 CJ est. value
Lincoln, NE 68508

University of Nebraska-Lincoln - Architecture Complex - Phase 2 - Mass Timber Package
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$11,393,000 CJ est. value
Lincoln, NE 68508

North Stadium Expansion Football Locker Procurement
Renovation, Alteration
Results
$1,100,000 est. value
Lincoln, NE

MSC Site Improvement
Infrastructure
Results
$600,000 est. value
Lincoln, NE

Southeast Community College Residence Hall - Lincoln Campus
New Construction, Infrastructure - 89,780 SF
Construction
$25,000,000 CJ est. value
Lincoln, NE 68520

O'Reilly Auto Parts (LN7) #6243 / Lincoln
New Construction, Infrastructure - 8,173 SF
Construction
$300,000 CJ est. value
Lincoln, NE 68516

17th & Holdrege Transformer #2 - SUB410 - City of Lincoln
New Construction, Infrastructure
Pending Verification
$3,204,000 CJ est. value
Lincoln, NE 68508

Stone Bridge Creek Mixed-Use Development / Lincoln
New Construction, Infrastructure - 700,000 SF
Pending Verification
$175,000,000 CJ est. value
North Bluff, NE 68336

Last Updated 03/08/2023 02:07 PM
Project Title

East Stadium Balcony Repairs and Improvements

Physical Address View project details and contacts
City, State (County) Lincoln, NE 68501   (Lancaster County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Site Development, Stadium
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $2,063,788 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 8, 2023, the project has been cancelled. At this time, it has not been confirmed if the project will be rebid. In order to participate in this bid you must submit your responses electronically through this Portal system. Bidders must be registered in to review more details regarding this opportunity. Please review all tabs in the bid to obtain the specific information before submitting a bid response. No paper bids will be accepted. The University of Nebraska is requesting proposals from qualified bidders to provide all material and labor for inspection and sounding, concrete repairs, vomitory demolition and infill, back row aisle modification, aisle step demolition and replacement, new aisle railings, expansion joint replacement, and waterproofing traffic membrane coating application for the Memorial Stadium-East Stadium Balcony. Bidder Questions Deadline 12/12/2022 1:00:00 PM (CT) In order to be given consideration, any questions or requests for bid interpretation must be received by the University of Nebraska Procurement Services office no later than this date/time. Questions must be submitted to ebid@nebraska.edu. The stadium repairs and waterproofing must be substantially completed not later than August 1, 2023. Liquidated damages in the amount of $2,000/Day will be accessed for each calendar day the project is delayed beyond August 4, 2023.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents