Similar Projects
Water Tank Recoating 2019
Post-Bid
Less than $150,000 est. value
Jacksonville, OH

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

0.5 MG Elevated Water Storage Tank
Results
$1,590,000 est. value
Tipp City, OH

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Contract I: Procurement of two hundred (200) Grinder Pump Cores, Controls and Appurtenances
Results
Hillsboro, OH 45133

H--Annual Water Tank Cleaning and Inspection | Base +4 OYs
Results
Chillicothe, OH

Supply and Installation of a 12,000 Gallon Horizontal, Doublewall Tank
Results
Circleville, OH 43113

Dogwood Reservoir Rehabilitation
Results
Less than $388,198 est. value
Dayton, OH 45390

Bowling Green WPC ATAD Tank Cover Replacement
Results
Less than $750,000 est. value
Bowling Green, OH 43402

Brooks Avenue Elevated Water Tank Improvements
Term Contract
Results
Less than $380,000 est. value
Van Wert, OH 45891

WRRF Sludge Tank
Results
Less than $1,800,000 est. value
Wooster, OH 44691

Compost - DEF Tank
Results
Columbus, OH

West Elkton Water Tower Replacement
Results
New Miami, OH 45011

Easterly Aeration Tanks Rehabilitation Project(Atr-4)(1540)
Results
Less than $12,600,000 est. value
Cleveland, OH 44115

Luckey Area Water Tower Aeration and Mixing Improvements Wl 183L (A)(1)
Results
Less than $100,000 est. value
Bowling Green, OH 43402

Reported 07/17/2020 12:00 AM
Project Title

Replace Hydrant Fuel System at Wright-Patterson Air Force Base

Physical Address View project details and contacts
City, State (County) Wright Patterson Air Force Base, OH 45433   (Greene County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project will construct a new Type III Hydrant System with two 5,000-barrel aboveground storage tanks and a 2,400 GPM pump house, and issue/return piping 12-inch hydrant loop. The existing hydrant loop with 14 in-apron hydrant pits shall remain in service. Project demolition will include removal of four 50,000-gallon underground storage tanks and the Type II pumphouse. The project will also construct a single-position emergency/secondary truck offload stand, hydrant hose truck checkout stand, and product recovery tank. Associated features include access roads, concrete secondary containment, containment drainage, provisions for temporary pig launcher and receiver, control systems, security fencing, and lighting.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents