Similar Projects
Last Updated | 06/29/2020 09:11 AM |
Project Title | Dodd Street Pedestrian Improvements Project |
Physical Address | View project details and contacts |
City, State (County) | Fairburn, GA 30213 (Fulton County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Removal of existing header curb, installation of new header curb, installation of new sidewalk, replacement of existing sidewalk as required, installation of new ADA handicap ramps, the replacement of existing handicap ramps as required, and the installation of concrete sidewalk-header curb-retaining wall combination as required. This contract will also include the preparation of sub-grade, saw-cutting, and demolition of existing asphalt as well as clean up and backfilling. The scope of the Add Alternate includes milling, asphalt paving, the installation of traffic print textured paving crosswalks, manhole adjustments, and associated tasks |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |