Similar Projects
Signage, Charleston - Fabricate and Install
Infrastructure
Bidding
$50,000 est. value
Pomona, NY

NYACK Tap-New Connectivites
Alteration
Post-Bid
Nyack, NY

2021 Sidewalk and Curb Improvements Hudson Avenue CDBG FY 2019
Infrastructure
Post-Bid
$50,000 est. value
Nyack, NY 10960

Samsondale Streetscape Improvements
Results
West Haverstraw, NY 10993

2021-2022 Concrete Curb 8 Sidewalk Replacement
Results
New City, NY

Starbucks / Nanuet
Demolition, New Construction, Infrastructure - 2,378 SF
Pending Verification
$750,000 CJ est. value
Nanuet, NY 10994

Pedestrian Safety Improvement Project
Infrastructure
Post-Bid
Suffern, NY

North Middletown Road Pedestrian Link Project
Results
Pearl River, NY 10965

2021 Road Improvements
Infrastructure
Post-Bid
Monsey, NY

Installation of Pavement Markings at Various Locations
Results
Albany, NY

Remove and Replace Entry Walkway Senior Center
Infrastructure
Post-Bid
Suffern, NY 10901

Repair ATONS Hudson River (FY21 CPOP)
Results
$1,000,000 to $5,000,000 est. value

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
$500,000 CJ est. value
Jacksonville, NC 28547

Concrete Bollards
Results
NY

RCC Roads, Parking Lots, Sidewalks Improvements
Infrastructure
Post-Bid
Suffern, NY 10901

Last Updated 08/01/2022 05:56 AM
Project Title

Construction of a Parking Lot and Service Area

Physical Address View project details and contacts
City, State (County) Tomkins Cove, NY 10986   (Rockland County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Exterior Lighting, Highway Signs/Guardrails/Barriers, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Project in for Redesign,
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will reconstruct the existing back-of-house service area at the historic Bear Mountain Inn. The project includes both the renovation of the service area as well as the addition of a formal parking lot, along with related site improvements. Work will include: • New asphalt, porous asphalt, and concrete pavements • New granite curbs and boulders • New and renovated plantings, including trees, shrubs, perennials and lawn • New wooden guardrail, fence, and gate • New rain gardens and other drainage infrastructure • New site lighting, relocated electric car charging stations, and related electrical workTotal sq ft for project not available at this time.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting, Planting Preparation, Soil Preparation, Planting Beds.
Division 48 - Electrical Power Generation, Electrical Power Control Equipment, Electrical Power Generation Battery Charging Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents