Similar Projects
Quincy Reservoir Improvements, Package C - Aeration System
Infrastructure
Bidding
$1,300,000 to $1,500,000 est. value
Aurora, CO

Sageport 2018 Local Improvements District (LID) & Bannock 2019 Local Improvement District
Infrastructure
Bidding
CO

Robinson Ditch Modification Project
Post-Bid
Basalt, CO 81621

Timnath Reservoir Shoreline Improvements
Post-Bid
Less than $500,000 est. value
Timnath, CO

Kahil Storm Drainage Project
Results
Less than $1,072,736 est. value
Fort Lupton, CO 80621

Root & Ratliff Salinity Control Pipeline Project
Results
$2,350,000 to $2,850,000 est. value
Mancos, CO

Guanella Reservoir 2022 Reclamation Project
Infrastructure
Bidding
Golden, CO

Copperleaf Water Quality Pond J Improvements
Post-Bid
$450,000 to $625,000 est. value
Aurora, CO

Shady Lane Drainage Improvement Project
Results
Redlands, CO 81507

EC2 Detention Pond Repair
Infrastructure
Bidding
Erie, CO

Irrigation Ditch
Post-Bid
Boulder, CO

North Chelton Road Drainage Improvements
Results
Colorado Springs, CO 80903

Colorado River Improvements at Kemp Breeze SWA
Infrastructure
Bidding
Durango, CO

Oligarchy Ditch Relocation Project
Post-Bid
CO

Sky Ranch Phase 2 Grading Project
Results
Lakewood, CO 80033

Last Updated 03/22/2022 06:17 PM
Project Title

Three Mile Creek Confluence

Physical Address View project details and contacts
City, State (County) Glenwood Springs, CO   (Garfield County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes but not limited to the following items: a. Removal of concrete debris, invasive species, and existing diversion structure. b. Various bank stabilization aspects and approaches. c. Filling of Atkinson Ditch and previously diversion channel. d. Development of river access areas. e. Revegetation of the area. f. Inclusion of signage.

Details

Division 10 - Specialties, Signage.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Planting Accessories, Landscape Edging.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents