Similar Projects
Towne Museum Exhibit Project
Renovation
Post-Bid
$5,800,000 CJ est. value
Kirksville, MO 63501

Hall of Waters Sat Grant Repair
Renovation
Post-Bid
Excelsior Springs, MO 64024

Elevator Replacement Governor's Mansion
Renovation
Bidding
$30,000 CJ est. value
Jefferson City, MO 65101

Art Museum Education Wing Replacement (AMMP Phase I) - 19-0050 - City of Springfield
Renovation
Conception
Less than $5,862,375 est. value
Springfield, MO 65807

Springfield Art Museum Archival Shelves
Renovation
Post-Bid
$145,000 CJ est. value
Springfield, MO 65807

Satchel Paige House
Renovation
Conception
Kansas City, MO 64128

WWI Gallery Refresh Phase 1 Stair Collections Center
Renovation - 10,000 SF
Post-Bid
$2,000,000 CJ est. value
Kansas City, MO 64108

Negro Leagues Baseball Museum Renovation / Kansas City
Renovation
Pending Verification
$1,000,000 CJ est. value
Kansas City, MO 64108

Laugh-O-Gram Studio Building Renovation / Kansas City
Renovation - 10,000 SF
Design
$2,000,000 CJ est. value
Kansas City, MO 64109

Replacing Windows, Doors, Sidewalks, Flooring, and Porch
Infrastructure, Renovation
Post-Bid
Pineville, MO 64856

Design, Fabrication, and Installation of Museum Exhibits
New Construction
Post-Bid
MO

JEFF 199879 - Old Courthouse Phase 2 Renovations, Gateway Arch National Park, Jefferson National Expansion
Renovation
Post-Bid
$10,000,000 CJ est. value
Saint Louis, MO 63102

Missouri History Museum Plaza Entrance
Renovation
Pending Verification
$2,000,000 CJ est. value
Saint Louis, MO 63112

Jefferson Arms Renovation
Renovation
Sub-Bidding
Saint Louis, MO 63101

Last Updated 01/13/2023 09:34 AM
Project Title

The Saint Louis Art Museum - Sculpture Hall Remediation

Physical Address View project details and contacts
City, State (County) Saint Louis, MO 63110   (Saint Louis City County)
Category(s) Entertainment/Recreation
Sub-Category(s) Museum
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 13, 2023, this project has not yet been awarded. The project is expected to be awarded on March 23, 2023. Deadline for questions is October 31, 2022. Questions regarding the scope of work should be directed, in writing, to Charlie Lutz, AIA, HOK. Questions over the phone will not be accepted. The Owner reserves the right to waive informalities in bids and to reject any and all bids WORK COVERED BY CONTRACT DOCUMENTS A. The Work of Project is defined by the Contract Documents and consists of the following: 1. The Project includes the stabilization and concrete sub-floor jacking injection method into voids, cavities and openings beneath the existing Sculpture Hall floor. 2. Project includes interior renovations including demolition and new construction removal and replacement of stone flooring and portions of the underlying tile setting grout. a. The existing underlying concrete slab beneath the setting grout shall remain in place, smoothed for application of newly applied cleavage membrane and stone tiling system. 3. The project work includes procuring new stone flooring surfaces and placing the stone over prepared concrete subfloor and mud-set thick bed to match the existing flooring surface in the Sculpture Hall. 4. The new work includes finishing the new stone slabs and partial existing stone surfaces to match the appearance of the existing floor surface. a. The finished flooring stone surface shall match in appearance, color, jointing and size of the existing stone flooring, meeting the designated slip resistance indicated in the technical specifications for the project.

Details

2,000 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents