Similar Projects
$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Design
Less than $98,000,000 est. value

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Design
Less than $98,000,000 est. value

On Call A and E QBS
New Construction, Infrastructure
Bidding
Portland, OR

On Call A and E QBS
New Construction, Infrastructure
Bidding
Portland, OR

Engineering, Planning and Development
Post-Bid

Engineering, Planning and Development
Post-Bid

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

FAA Airport Traffic Control Tower Design Competition
New Construction
Bidding

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Post-Bid

Interstate Firehouse Cultural Center Feasibility Study
New Construction, Infrastructure
Results
Portland, OR 97217

Regional A-E Environmental Services
Renovation, Term Contract
Bidding

ODA Aviation Engineering Services Consulting Services (Engineering/Inspection and Ca) Airport Specific
Infrastructure
Post-Bid

Unr AE Afp Design MATOC
New Construction, Term Contract
Post-Bid
Less than $30,000,000 est. value

Last Updated 11/17/2021 01:17 PM
Project Title

Design Services for Molalla River Bridge Rehabilitation Project

Physical Address View project details and contacts
City, State (County) OR   (Clackamas County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To provide project management, survey, environmental services, utility coordination, geotechnical, traffic engineering, public outreach assistance, and the development of both preliminary design and final PS&E (Plans, Specifications and Estimates) design, right of way (as a contingency), geological services. Rehabilitation of the existing bridge shall include: Phase 1 seismic retrofit (superstructure only) Paint steel girders of spans 1, 2, 4, 5, 6 to include spot removal of rust and flaking; Deck joint repair (all 7 bents); Deck repair at a minimum - Class II deck prep in spots, Class I for remainder and a Polymer Concrete overlay ¾” over entire bridge; Repair delamination’s and concrete spalls of columns, abutments and pier caps; Perform column jacketing for scour protection at bents 3, 4 and 5 (6 columns total); Rip rap scour protection at Bents 2, 3, 4 and 5; Epoxy inject cracks in Bent 7 wall; Remove six H-pile in vicinity of Bents 3 and 4. (Work bridges are anticipated for the In-water work, H-pile removal, column jacketing and rip rap placement).

Details

Architectural, New Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents