Similar Projects
US 176 Widening Phase I
Post-Bid
SC

Wappoo Road at SC Highway 61 Intersection Improvements TST
Results
Charleston, SC

Preservation - District 6
Results

District 6 Interstate Patching
Results

Summer 2020 Resurfacing
Results
Summerville, SC 29483

Reconstruction/Rehabilitation - Berkeley County
Results
SC

Intersection Improvements - US17 A/S-48/S-97/S-40
Results
SC

Dirt to Pave of 6 Roads
Results
Less than $3,684,450 est. value
Moncks Corner, SC 29461

Repair Airfield Parking Ramp Joint Base Charleston, SC
Results
$1,000,000 to $5,000,000 est. value
Charleston, SC 29404

IDC for Asphalt Repair, Seal coating and Striping
Results
Less than $600,000 est. value
Moncks Corner, SC 29461

Widening - I-526 Clements Ferry
Results
SC

Safety Improvements - US 176
Results
SC

Reconstruction/Rehabilitation - District 6
Results

Asphalt Resurfacing
Results
Summerville, SC

Sangaree Parkway and Royle Road Intersection
Results
Moncks Corner, SC 29461

Last Updated 06/22/2021 07:41 AM
Project Title

Henry Brown Boulevard Phase 2 Improvements

Physical Address View project details and contacts
City, State (County) Goose Creek, SC 29445   (Berkeley County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes roadway improvements of approximately 4.0 miles on Phase 2 of Henry E. Brown Jr. Boulevard, Montague Plantation Road, Old Mount Holly Road, and US-52 in Berkeley County, SC. The project scope includes widening the two lane section to athree lane section, with raised landscaped medians, painted medians, and dedicated left turn lanes atkey intersections between Liberty Hall Road and US-52, major intersection improvements at US-52/Old Mount Holly/Montague Plantation Road to include widening the at-grade CSX railroad crossing, and a new multiuse path along the entire length of the project. This project also includes water relocations of approximately 5500 LF of waterline and sewer relocations include a new pump station access and air release valve.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents