Similar Projects
Spearfish Boiler System Replacement Project
Renovation
Sub-Bidding
$225,000 CJ est. value
Spearfish, SD 57783

Arts and Sciences, HVAC Upgrade
Renovation
Sub-Bidding
$400,000 CJ est. value
Vermillion, SD 57069

Generator Air Coolers, Gavins Point Dam
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value
Yankton, SD 57078

Used AC Unit, Chiller, Oak Cabinets
Alteration
Post-Bid
Pierre, SD

NWS-CR Geothermal Heating, Ventilation, and Air-Conditioning Conversions
Term Contract
Results
$500,000 to $1,000,000 est. value
Lincoln, IL - Indianapolis, Syracuse, IN - Goodland, Wichita, KS - Jackson, KY - Grand Rapids, Marquette, MI - Duluth, MN - Pleasant Hill, MO - Bismarck, Grand Forks, ND - Hastings, NE - Aberdeen, SD - La Crosse, WI

Lincoln County Courthouse HVAC Upgrades
Alteration
Results
SD

Physical Education Center - Rooftop Unit Replacement
Alteration
Post-Bid
Brookings, SD 57007

Steam Tunnel Repair, Phase 7
Alteration
Results
Rapid City, SD 57701

Heating, Ventilating, and Air Conditioning (HVAC) Maintenance and Repair Services
Alteration
Post-Bid
Sioux Falls, SD

Woonsocket School Gymnasium HVAC Improvements
Alteration
Results
Woonsocket, SD 57385

Eubanks Replacement Units
Infrastructure
Post-Bid
Rapid City, Sioux Falls, SD

Pierson Hall, Replace Heating, Ventilating and Air Conditioning System
Alteration
Results
Brookings, SD 57006

Black Hills National Forest HVAC Maintenance
Term Contract
Post-Bid
Custer, SD 57730

Infirmary Heating and Cooling Upgrade
Alteration
Results
Redfield, SD 57469

Range Hood & Make-Up Air System
Alteration
Post-Bid
Edgemont, SD 57735

Last Updated 03/10/2023 03:11 PM
Project Title

Exterior Walk in Cooler / Freezer

Physical Address View project details and contacts
City, State (County) Hurley, SD 57036   (Turner County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Viborg-Hurley School District #60-6 Hurley, SD Invitation for Bid Minimum Specs: Exterior Walk in Cooler/Freezer Combination with Floor, NSF Norlake, Kolpak, Thermalrite/ICS or equal or better are approved manufacturers On-site visit will be required prior to submitting proposal Proposal will need to be accompanied by a design to be considered Project will not be able to begin until approximately 5/29/2023, but shall be completed by 6/30/2023 Exterior Dimensions: 14'x18' x 8'7', 4" Foamed in Place Panels, 26 gauge embossed coated Galvalume Exterior and Interior, Interior Panels White, Aluminum Smooth Finish Floor, Units will Share an Interior Common Wall. Freezer Section to maintain -10F, Cooler Section to maintain 37F. Unit to be installed on an Existing Slab. Building Voltage 208/60/1 1 ea Sloped Weather Roof with Weather Roof Cap- Sloped away from the building 2 ea Roof Mounted Compressor Units 1 ea Exterior Ramp 1 ea Interior Trim 1 ea Non-Skid Floor Strips 2 ea 36" Doors with Door Closures, Deadbolt Locking Handles 2 ea Digital Thermometers 4 ea 48" LED Lighting 1 ea Minimum 10-year Panel Warranty 2 ea 5 Year Compressor Warranties Contractual Liability covers the following indemnity agreement: The contractor shall indemnify and hold harmless The Board against any form of liability, claims, damages, demands, and cost, including attorney fees of every kind and nature and attributable to bodily injury, sickness, disease, or death or to damage or destruction of property resulting from or in any manner arising out of or in connection with the performance of this contract Comprehensive General Liability Bodily Injury: $1,000,000 Each Occurrence $1,000,000 Annual Aggregate Property Damage: $1,000,000 Each Occurrence $1,000,000 Annual Aggregate OR Single Limit: $2,000,000 Each Occurrence The installation of the walk-in cooler/ freezer to include receiving the boxes and all associated materials at the job site and assuming all damages, setup of the unit in place, mounting of condensers outside on the walk-in roof, running refrigeration lines, drain lines, piping, wiring, hooking up electrical connections to the units. A 54" width door opening will need to be cut in the existing exterior wall to allow for access from the interior of the building. It also includes installation of trim of interior and exterior walls. The vendor is responsible for starting the unit and making all necessary adjustments. The Vendor is responsible for all trash/crating removal. The Vendor will provide drawings for owner's approval before ordering. Contact: Matt Jensen @ Matt.Jensen@k12.sd.us OR 605-766-5059 The refrigeration contractor will provide one return trip to the job site ten (10) days after startup to check refrigerant and oil levels and adjust temperature defrost times. Unit to be fullyfunctioning.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents