Similar Projects
Avalon Pedestrian Bridge and Gateway Projects - Port of Los Angeles - Construction Division
New Construction, Infrastructure
Conception
Los Angeles, CA 90744

Expo/Crenshaw Transfer Station Improvements - Los Angeles County Metropolitan Transportation Authority
Infrastructure, Renovation
Conception
$999,000,000 CJ est. value
Los Angeles, CA 90012

One Beverly Hills
Demolition, New Construction, Renovation, Infrastructure
Design
$2,000,000,000 CJ est. value
Beverly Hills, CA 90210

Violet Street Mixed-Use Building
New Construction, Infrastructure - 511,604 SF
Design
$100,000,000 CJ est. value
Los Angeles, CA 90021

Berths 238-239 Marine Oil Terminal Improvements
Infrastructure
Bidding
$25,000,000 CJ est. value
Los Angeles, CA 90731

Los Angeles Valley College Academic Complex 1
New Construction, Infrastructure - 80,000 SF
Post-Bid
$60,000,000 CJ est. value
Los Angeles, CA 91401

RFQ D/B - Los Angeles Valley College Demolition of Theater Arts Building
Demolition, Infrastructure
Post-Bid
$4,000,000 CJ est. value
Los Angeles, CA 91401

Colorado Lagoon Open Channel Phase 2A
Infrastructure
Results
$21,123,100 CJ est. value
Long Beach, CA 90803

Pioneer Boulevard Street Improvements
Infrastructure
Results
$672,902 CJ est. value
Santa Fe Springs, CA 90670

The Mark at Los Angeles
Demolition, New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Los Angeles, CA 90024

San Pedro Courthouse Redevelopment / Los Angeles
New Construction, Infrastructure, Build-out - 361,500 SF
Construction
$10,000,000 CJ est. value
Los Angeles, CA 90731

Crossroads of the World
Demolition, New Construction, Infrastructure - 285,000 SF
Pending Verification
$1,000,000,000 CJ est. value
Los Angeles, CA 90028

Yucca Argyle Multi-Use Development
Demolition, New Construction, Infrastructure - 316,948 SF
Pending Verification
$180,000,000 CJ est. value
Los Angeles, CA 90028

C Line (Green) Extension To Torrance - Los Angeles County Metropolitan Transportation Authority
New Construction, Infrastructure
Conception
$999,000,000 CJ est. value
Torrance, CA 90503

Harper on Sunset Mixed Use Development
Demolition, New Construction, Infrastructure
Design
$97,000,000 CJ est. value
West Hollywood, CA 90046

Last Updated 07/13/2023 09:14 AM
Project Title

Pier E Sewer Lift Stations 110 and 112 Modifications

Physical Address View project details and contacts
City, State (County) Long Beach, CA 90802   (Los Angeles County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $2,734,660 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of July 13,2023 , this project has not yet been awarded. The project is expected to be awarded on July 24,2023.** All questions, including requests for interpretation or correction, or comments regarding the Contract Documents, must be submitted no later than May 9, 2023, at 5 p.m. Questions received after the pre-Bid question deadline will not be accepted. Scope of Services Summary Description of the Work. The Work required by this Contract includes, but is not limited to, the following: retrofitting construction of two existing sewer lift stations including modifying well floor slab; installing submersible pumps, valve vaults, and associate piping; providing electrical modifications and PLC instrumentations for SCADA connection; constructing manhole; and implementing temporary sewer bypass measures for the retrofitting construction. See Section 01 11 00, Summary of Work in the Technical Specifications. All questions, including requests for interpretation or correction, or comments regarding the Contract Documents, must be submitted no later than May 9, 2023, at 5 p.m. Questions received after the pre-Bid question deadline will not be accepted. The Estimated Bid Value has been changed to $2,292,000. The combined SBE/VSBE participation goal for this Project is thirty percent (30%) of total bid value. The combined SBE/VSBE participation goal shall include a minimum five percent (5%) of total bid value as VSBE. Contract Time and Liquidated Damages. The Contractor shall achieve Substantial Completion of Work within 570 calendar days and Affidavit of Final Completion of the Project within 660 calendar day

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents