Similar Projects
Last Updated | 08/22/2023 04:47 PM |
Project Title | Parking lot repaving |
Physical Address | View project details and contacts |
City, State (County) | Niagara Falls, NY 14301 (Niagara County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Abandoned, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $700,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of August 22, 2023, project is cancelled. Project is no longer needed. The Niagara Frontier Transportation Authority is seeking proposals for the procurement of the milling, repair, and repaving of the parking lot at the Portage Road Transportation Center located at 1124 Portage Road, Niagara Falls, NY 14301. Proponents must propose a detailed plan to mill the surface of the parking lot excavating weak areas of the parking lot below grade. A compact stone base would be required in weak areas prior to applying paving surface to entire parking lot. The cost for any applicable environmental fees, debris removal, equipment charges and adaptation charges are to be included with the cost proposal. Go to NFTA's Procurement Page (link listed below) under the Procurement Solicitation (RFP/IFB) Retrieval Instructions Section for more information on how to register as a supplier in our new Procurement Bonfire Portal and to download the RFP or IFB documents. Procurement - Niagara Frontier Transportation Authority . CR Number: 2099926 Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 0% Women Owned Sub-Contracting Goal: 0% Service-Disabled Veteran-Owned Business Contracting Goal: 0% Disadvantaged Owned Sub-Contracting Goal: 0% Register to attend the Pre-Proposal Conference and Site Inspection Contract term: ONE TIME Weak areas (Potholes, etc.): - Remove existing asphalt surface. - Excavate a minimum of 12-13-inches below finish grade. - Compact the sub-base. - Install a minimum of 9-inches of 2-inch crusher run compacted thickness. - Finish to grade with 1-inch crusher run compacted. Paving surface (Entire surface): - Install 4 inches of type 3 binder compacted thickness. - Install 1.5 inches of type 7F top compacted thickness. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |