Similar Projects
Stream Data Center - Phoenix II-V/Phase 2-5
New Construction, Renovation, Infrastructure - 1,582,000 SF
Conception
$150,000,000 CJ est. value
Goodyear, AZ 85338

Latino Cultural Center - AR00000005 - City of Phoenix
New Construction, Renovation, Infrastructure
Conception
$902,484 CJ est. value
Phoenix, AZ 85004

Fairfield Inn / Scottsdale
New Construction, Infrastructure - 75,622 SF
Design
$33,000,000 CJ est. value
Scottsdale, AZ 85255

Central and Thomas High Rise
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Phoenix, AZ 85012

Power Road Self Storage Facility / Mesa
New Construction, Infrastructure - 102,332 SF
Bidding
$10,500,000 CJ est. value
Mesa, AZ 85212

Lehi Loop Shared Use Pathway - Phase 1
Infrastructure
Post-Bid
$6,000,000 CJ est. value
Mesa, AZ 85208

Site 20 New Reservoir Construction - Town of Gilbert
Infrastructure
Post-Bid
$13,700,000 CJ est. value
Gilbert, AZ 85297

Construction Manager at Risk Booster Pump Station 83A/B Rehabilitation
Results
$8,500,000 to $1,500,000 est. value
Scottsdale, AZ 85258

Construction Manager at Risk Well Head Treatment Project-Well 7 Project
Alteration
Results
$7,000,000 est. value
Tempe, AZ

5290 East Exeter Subdivision
New Construction
Construction
Phoenix, AZ 85018

Gateway Freeway (SR 24) (Ellsworth Road to Ironwood Drive)
New Construction, Infrastructure
Construction
$76,999,509 CJ est. value
Mesa, AZ 85212

Laveen Spectrum
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Phoenix, AZ 85041

RFQ Design - Northeast Public Safety Facility
New Construction, Infrastructure
Pending Verification
$37,000,000 CJ est. value
Mesa, AZ 85207

Airport T-Hangar Buildings - 103970 - City of Buckeye
New Construction, Infrastructure - 10,080 SF
Conception
$5,550,000 CJ est. value
Buckeye, AZ 85326

AutoZone #3000 / Phoenix
New Construction, Infrastructure - 6,500 SF
Design
$1,500,000 CJ est. value
Phoenix, AZ 85254

Last Updated 01/25/2023 05:09 PM
Project Title

New Well Drilling : Desert Well 24 and 25

Physical Address View project details and contacts
City, State (County) Mesa, AZ 85201   (Maricopa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $3,430,019 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

This contract shall be for furnishing all labor, materials, transportation and services for the construction and/or installation of the following work: Drill new wells at Desert Well 24 and Desert Well 25 per the TechnicalSpecifications. Drill two (2) 15-inch diameter pilot holes, conduct well logs, perform depth sampling, ream holes to 32-inches in diameter, install two (2) 20-inch well casings, install gravel packs, develop two wells, cap wells, install 6-foot high chain link enclosure around the well heads with a 10-foot wide single gate, and other items necessary for completion of the project in accordance with the Approved Plans and Specifications at two well sites. For all technical, contract, bid-related, or other questions, please contact Donna Horn at donna. horn@mesaaz.gov. Contact with City Employees. All firms interesteThe successful bidder, simultaneously with the execution of the Contract, will be required to furnish a Payment Bond in the amount equal to one hundred percent (100%) of the Contract Price, a Performance Bond in an amount equal to one hundredd in this project (including the firm's employees, representatives, agents, lobbyists, attorneys, and subconsultants) will refrain, under penalty of disqualification, from direct or indirect contact for the purpose of influencing the selection or creating bias in the selection process with any person who may play a part in the selection process. This policy is intended to create a level playing field for all potential firms, to assure that contract decisions are made in public, and to protect the integrity of the selection process. All contact on this selection process should be addressed to the authorized representative identified above. Work shall be completed within 280 consecutive calendar days, beginning with the day following the starting date specified in the Notice to Proceed. Bids must be submitted on the Proposal Form provided and be accompanied by the Bid Bond for not less than ten percent (10%) of the total bid, payable to the City of Mesa, Arizona, or a certified or cashier's check The successful bidder, simultaneously with the execution of the Contract, will be required to furnish a Payment Bond in the amount equal to one hundred percent (100%) of the Contract Price, a Performance Bond in an amount equal to one hundred percent of the contract price and the omost recent certificate of liability insurance form with additional insured endorsements. The right is hereby reserved to accept and reject any or all bids or parts thereto, to waive any informalitites in any proposal and reject the bids of any persons who have been delinquent or unfaithful to any contract with the city of mesa. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. For all technical, contract, bid-related, or other questions, please contact Donna Horn at donna.horn@mesaaz.gov

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents