Similar Projects
Site Development - East Side Terminal Area - 47732185 - City Of Lee Summit
New Construction, Infrastructure
Conception
$2,653,000 CJ est. value
Lees Summit, MO 64064

Bailey Park Development - #33032784 - City Of Lees Summit
New Construction, Renovation, Infrastructure
Conception
$7,500,000 CJ est. value
Lees Summit, MO 64063

Bank Stabilization and Navigation Project River Mile 260 to 360
Infrastructure
Design
$100,000,000 CJ est. value
Kansas City, MO 64106

Gabriel Tower Apartments
Build-out, Renovation, Infrastructure - 101,646 SF
Bidding
$10,000,000 CJ est. value
Kansas City, MO 64127

KCI Signage and Landscaping
Infrastructure
Bidding
$174,000 CJ est. value
Kansas City, MO 64106

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

11th Plat Pump Station Repairs 2021
New Construction
Post-Bid
Kansas City, MO

2021 Shalimar Park Field Grading
Infrastructure
Results
Grandview, MO 64030

Automated Rakes for Fine Screening of Wastewater
New Construction
Results
Independence, MO 64052

3rd Street Improvements - Jefferson Street to Blue Parkway/US50 - 57532272 - City of Lees Summit
Infrastructure
Conception
$6,549,000 CJ est. value
Lees Summit, MO 64063

SLBE Bannister Road Sidewalks (South Side) Blue Ridge Boulevard to Eastern Avenue
Infrastructure
Bidding
$200,000 CJ est. value
Kansas City, MO 64138

Demolition of 1308 West Main Street
Infrastructure
Post-Bid
Blue Springs, MO 64015

39th Street Reservoir Pump Station Pump 2 Motor Replacement
Renovation
Results
Independence, MO 64055

Field House - 47232784 - City of Lees Summit
New Construction, Infrastructure
Conception
$16,000,000 CJ est. value
Lees Summit, MO 64063

Electrical Substation Upgrade
New Construction
Post-Bid
Independence, MO 64050

Last Updated 07/22/2022 07:33 AM
Project Title

Tudor Road Pump Station Force Main Drain Line - 97231783 - City of Lees Summit

Physical Address View project details and contacts
City, State (County) Lees Summit, MO 64063   (Jackson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $550,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install a gravity line from the Tudor Road Pump Station Force Main to a nearby collection system. The gravity line will be controlled by a valve and will allow the draining of the force main when not in use. This project is in included in the City of Lees Summit FY 2023-2027 Capital Improvement Plan (CIP). As of JUly 22, 20224, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents