Similar Projects
Last Updated | 01/08/2021 12:14 PM |
Project Title | Resurfacing of Citrus County Road - North Forest Ridge Boulevard from West Lake Beverly Drive to CR 491 |
Physical Address | View project details and contacts |
City, State (County) | FL (Citrus County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $705,840 |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Provide roadway resurfacing services for four lanes of Citrus County Road Forest Ridge Blvd. from W. Lk. Beverly Dr. to CR491, approximately 1.9 miles per lane (Exhibit "A") . This includes milling (anticipated to be an average depth of 1.25”) to expose the base, then resurface with an asphalt finish course 1.5" thick (spread rate shall be 165 lb. per sq. yd. +/- 5% per FDOT spec.), being FC-12.5 with PG 76-22 polymer binder - Traffic Level C pursuant to the current FDOT Standard Specifications for Road and Bridge Construction, July 2020. Asphalt to be provided for project will be identified on the current FDOT Asphalt Mix Design Plant Assignment Sheet. Pavement markings and signage are to meet current MUTCD criteria. Deficiencies with regards to the roadway physical characteristics which are below the standards for FDOT and County will be corrected as part of this project. Work includes, but is not limited to, exposing and cleaning edge of existing pavement, milling, paving, temporary and permanent pavement markings, redressing, installing new R.P.M.s, shoulder grading, sodding, and other items. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |