Last Updated | 06/20/2023 12:11 PM |
Project Title | 2022 Bond - Paola USD 368 |
Physical Address | View project details and contacts |
City, State (County) | Paola, KS 66071 (Miami County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | Elementary School, Middle/Senior High School, Site Development |
Contracting Method | Competitive Bids |
Project Status | Schematic Drawings, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $40,000,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | http://www.tncontentexchange.com/news/local/no-3-paola-school-bond/article_26d8a500-deab-5481-9d04-7ff0a7c51980.html PAOLA -- Shortly after the August primary election in 2022, Paola USD 368 conducted a mail-ballot election in September asking voters to approve a $40 million school bond to address end-of-life issues at each of the district's aging buildings. The bond proposal narrowly failed by 77 votes, with 1,506 "Yes" votes (48.75 percent) and 1,583 "No" votes (51.25 percent). The needs at the buildings didn't go away though, and school district leaders and school board members are now targeting a fall 2023 bond proposal.District officials gathered community feedback about the failed bond from an online Google document survey and a community bond discussion meeting Nov. 29 at Sunflower Elementary. They now hope to modify the next bond proposal to better fit what the public will support, and school board members have also emphasized the importance of better communicating the needs of the district to local community members before the next bond proposal. School board members plan to map out the details during a work session Thursday, Jan. 5.Some of the biggest proposed changes at Cottonwood Elementary include reconfiguration of the drop-off drive and additional parking, a new early childhood center addition featuring two classrooms, updates to HVAC and utilities, and upgrades to flooring and the playground. Similar upgrades are planned at Sunflower Elementary, including improvements to flooring, plumbing, lighting, playground, and media center ceiling. At Paola Middle School, one of the biggest proposed changes is relocating the existing media center to open up the commons area, where school administrators have struggled to find enough space for lunch and other activities. Proposed design plans show the media center could be moved to the west and placed alongside a new art classroom, or the media center could be expanded to fill the entire space, and the existing art room could be remodeled. Other planned improvements at the middle school include HVAC and kitchen updates, as well as upgrades to flooring, plumbing, electrical and lighting. The highlight of the planned improvements at Paola High School is the proposed career and technical education addition in the southeast portion of the school. Other planned improvements at the high school include updates to the commons restroom, HVAC, flooring, and clock system, as well as upgrades to the theater lighting, ceilings and lighting throughout the building. _________________________________________________________ As of July 12, 2022, the Paola USD 368 board has approved issuing a $40 million bond issue referendum scheduled for September 8, 2022 bond election. The bond calls to construct new section for the elementary onto the high school including career and technical education addition, renovations and modernization of learning spaces, mechanical, electrical and plumbing upgrades Paola Middle School, renovations and modernization of learning spaces mechanical, electrical and plumbing upgrades Sunflower Elementary, mechanical, electrical and plumbing upgrades playground upgrades, soft play surface Cottonwood Elementary, pre-K classroom addition reconfigured and expanded car pickup lanes additional parking for school and baseball/softball complex, mechanical, electrical and plumbing upgrades, playground upgrades, soft play surface districtwide, and roofing replacements, exterior maintenance asphalt replacement turf replacement when at end of life Owners contingency. |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |