Similar Projects
Regional Water Reclamation Facility Contract 1 - RWRF Expansion
Addition, Demolition, Infrastructure
Bidding
$55,000,000 CJ est. value
Clinton, IA 52732

Regional Water Reclamation Facility Contract 2 - Anaerobic Treatment System
Renovation
Bidding
$27,300,000 CJ est. value
Clinton, IA 52732

Sioux City Elec Maint Bld Water Softener Replacement
Alteration
Post-Bid
Hinton, IA 51024

Cobblestone Hotel & Suites - City of Ottumwa
New Construction, Infrastructure
Post-Bid
$9,900,000 CJ est. value
Ottumwa, IA 52501

Polk County Election Office Fire Suppression, Plumbing, Mechanical and Electrical Repairs
Alteration
Results
Des Moines, IA 50309

Lake Wapello State Park Boy Scout Pond Outlet Replacement
Renovation, Infrastructure
Results
Drakesville, IA 52552

Maquoketa Wastewater Treatment Plant Improvements
Renovation, Infrastructure
Bidding
$12,250,000 CJ est. value
Maquoketa, IA 52060

Install Multiplex Water Softener
Alteration
Post-Bid
$250,000 to $500,000 est. value
Ames, IA 50010

Sump Pump Abatement Project Alley West of Kelling Street
Infrastructure
Results
$149,882 CJ est. value
Davenport, IA 52804

Linn Grove Dam and Park Restoration
Infrastructure, Renovation
Bidding
$8,000,000 CJ est. value
Linn Grove, IA 51033

2022 Stormwater Intake Repair Program
Infrastructure
Post-Bid
$295,867 CJ est. value
Des Moines, IA 50315

Springreen Apartments Water Main Improvement Project
Infrastructure
Results
$113,984 CJ est. value
Asbury, IA 52002

Knoxville Veteran's Park
Infrastructure
Bidding
$990,000 CJ est. value
Knoxville, IA 50138

Time and Material (NTE), Commercial Plumbing Contracting
Term Contract
Post-Bid
Ames, IA 50010

WWTP Vertical Loop Reactor Replacement Air Piping
Infrastructure
Results
$390,000 CJ est. value
Carroll, IA 51401

Last Updated 01/14/2023 01:34 AM
Project Title

SW State Street Reconstruction - Southbound Lanes

Physical Address View project details and contacts
City, State (County) Ankeny, IA 50023   (Polk County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,407,593 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Southbound Lanes project includes the full depth removal and replacement of PCC street pavement for the southbound lanes from SW Ordnance Road to just south of West First Street in the City of Ankeny. The improvement includes the construction of approximately 8,750 SY of 9" PCC Class C-SUD pavement, 400 SY of 9" full depth PCC Class C-SUD patching, 2,600 LF of subdrain, removal of 10,100 SY of subgrade to a depth of 6" and replacement with subgrade preparation, modified subbase, paved medians, driveways, sidewalks, new pedestrian push button and associated traffic signal work at the SW State Street and SW Ordnance Road intersection, cast-in-place replacement of storm sewer intakes, water valve installation and water valve removals, City--owned electric line installation and electric line removals, pavement removal, pedestrian ramps, pavement markings, signs, temporary traffic control, erosion control, final surface restoration, mobilization, and miscellaneous associated work necessary to complete the project.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents