Similar Projects
Fire Station 6 - City of Mansfield
New Construction
Conception
$6,000,000 CJ est. value
Mansfield, TX 76063

Fire Station #7
New Construction
Conception
$7,100,000 est. value
College Station, TX

Fire Station 2
New Construction
Design
$4,500,000 est. value
Humble, TX 77338

New Law Enforcement Center
Addition
Design
Mansfield, TX 76063

City of Duncanville Fire Station #1
New Construction - 15,500 SF
Post-Bid
Duncanville, TX 75116

South Patrol Division Facility
New Construction - 31,899 SF
Post-Bid
$10,750,000 est. value
Fort Worth, TX 76102

Inter Community Volunteer Fire Department - New Sub Station No. 2
New Construction - 2,400 SF
Results
$385,000 to $415,000 est. value
Carthage, TX 75633

Desig-Build of Montgomery County Sheriff`s Office Fifty Yard Indoor Full Tactical Range
Results
Conroe, TX 77301

Fire Station 5
New Construction - 10,000 SF
Construction
$5,300,000 est. value
The Colony, TX 75056

Fire Station #1 and Fire Prevention Building Re-build
New Construction, Demolition - 17,678 SF
Construction
$8,900,000 est. value
Arlington, TX 76010

Fire Station #7
New Construction - 14,300 SF
Pending Verification
Pearland, TX

Police Training Center
Renovation - 1,700 SF
Pending Verification
Pearland, TX

Fire Station #3 Remodel - 726 - City of San Marcos
Renovation
Conception
$1,000,000 CJ est. value
San Marcos, TX 78666

Police Weapons Range New Classroom Building
New Construction
Design
$630,000 est. value
Waco, TX 76708

New Fire Station 6 - Travis County Emergency Services District No 2
New Construction
Post-Bid
Pflugerville, TX 78660

Last Updated 11/17/2022 08:35 AM
Project Title

Remodel Central Fire Admin Building - FT-FIRE43 - City of Round Rock

Physical Address View project details and contacts
City, State (County) Round Rock, TX 78664   (Williamson County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remodel Central Fire Admin Building A detailed scope has not yet been determined This project is included in the city's 2023-2027 Capital Improvement Plan (CIP). As of November 17, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents