Similar Projects
Widen I-71 From Four to Six Lanes From KY-393
Infrastructure
Conception
$40,000,000 CJ est. value
Crestwood, KY 40014

Widen I-71 From Four to Six Lanes From KY-393
Infrastructure
Conception
$40,000,000 CJ est. value
Crestwood, KY 40014

John Back Aquatic Center Pool Renovation
Infrastructure, Renovation
Bidding
$700,000 CJ est. value
La Grange, KY 40031

John Back Aquatic Center Pool Renovation
Infrastructure, Renovation
Bidding
$700,000 CJ est. value
La Grange, KY 40031

Pavement Improvements at Various Locations
Infrastructure
Post-Bid
$300,000 est. value
Buckner, Crestwood, KY

Muirs Lane Paving Improvement
Infrastructure
Post-Bid
$200,000 est. value
Pewee Valley, KY 40056

Site Improvements
Infrastructure
Results
$79,000 est. value
La Grange, KY

Site Improvements
Infrastructure
Results
$79,000 est. value
La Grange, KY

Parkside Estates
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
La Grange, KY 40031

Sanctuary Falls Phase 2
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Crestwood, KY 40014

Flats at Twenty
New Construction, Infrastructure
Conception
$81,500,000 CJ est. value
La Grange, KY 40031

Springs Park - Phase 1 Site Improvements
Renovation, Infrastructure
Results
La Grange, KY 40031

Crestwood Properties
New Construction, Infrastructure
Pending Verification
$850,000 CJ est. value
Crestwood, KY 40014

Asphalt Resurfacing
Infrastructure
Results
KY

Baptist Health Central Pharmacy
New Construction, Infrastructure - 90,000 SF
Pending Verification
$40,000,000 CJ est. value
La Grange, KY 40031

Last Updated 10/13/2022 01:04 PM
Project Title

Bishop Place Apartments

Physical Address View project details and contacts
City, State (County) La Grange, KY 40031   (Oldham County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 14, 2022, this project is seeking approval from the Oldham County Planning and Zoning Board. Construction permit has not been filed. Information regarding an architect and general contractor has not been disclosed. A firm timeline has not been confirmed, but construction could begin in fourth quarter 2022.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents