Similar Projects
Last Updated | 07/03/2023 09:35 AM |
Project Title | Request for Proposal Water Treatment Plant Laboratory Renovation |
Physical Address | View project details and contacts |
City, State (County) | Frankfort, KY 40601 (Franklin County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $159,600 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of June 3, 2023 project is awarded to Herrick Company, awarded amount is $159,600.00. The scope of services shall include but are not limited to: 1. Conduct and attend meetings with FPB staff throughout project to ensure goals and objectives are being met. 2. Demolish/remove existing floor, cabinets, tables, fume hood and contents, refrigerator, and all other necessary items. 3. Install an epoxy floor coating system. Work includes all grinding and surface preparation required to apply epoxy coating. 4. Relocate sinks, reroute potable water lines, and sample lines. 5. Reroute deionized water line in both the lab and in the electric room located below the lab. 6. Install new and/or relocate electrical wiring and outlets as needed per code and per owner request. Install new lighting. 7. Lower the drop ceiling, install new HVAC vents and returns for the lab and attached bathroom. 8. Replace three windows. 9. Installation of new cabinets and countertops from VWR in accordance with drawings in Appendix A. Material list in in Appendix B. (Contractor shall have experience in cutting epoxy and phenolic countertops.) Contractor to review attached list of materials and include any suggested revisions/additions in the proposal. Contractor responsible for ensuring all correct materials are ordered. 10. Coordinate with Owner to develop the plan for continuous operation of the water quality lab during renovation. 11. All other work necessary to fully complete the project |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |