Similar Projects
New Drinking Water Well - City of Woodstock
New Construction, Infrastructure
Conception
$1,750,000 CJ est. value
Woodstock, IL 60098

Plote Field LED Lighting Upgrade Project
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Lake in the Hills, IL 60156

Lamps and Ballasts
Term Contract
Post-Bid
Algonquin, IL

2021 Electrical Equipment Upgrades
Alteration
Post-Bid
Crystal Lake, IL 60012

LED Lights Upgrade for Buildings A and B
Results
McHenry, IL

Woods Creek Pump Station Improvements
Results
Algonquin, IL

Lift Stations #23 & #24 Replacement Pump Purchase
Renovation
Post-Bid
Crystal Lake, IL

Crystal Lake Fire Stations #3 And #4 IAQ Improvements
Renovation
Results
Crystal Lake, IL

Performance Contracted Energy Project
Alteration
Post-Bid
Harvard, IL

PAV HA 6th Floor Lab - RO System Upgrade BP-02 (GC)
Alteration
Results
Lexington, KY 40506

Electrical Contractor
Alteration
Post-Bid
McHenry, IL

Annual Maintenance of Electrical Systems
Term Contract
Results

Bayview Lift Station Generator
Alteration
Results
Fox River Grove, IL 60021

Lift Station No. 16 Improvements
Renovation
Results
Crystal Lake, IL 60014

Lift Station No. 19 Generator Replacement
Alteration
Results
Crystal Lake, IL

Last Updated 08/04/2022 10:08 AM
Project Title

2022 Millstream Sanitary Lift Station Electrical and Control Improvements

Physical Address View project details and contacts
City, State (County) McHenry, IL 60050   (McHenry County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Electric, Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $20,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed improvements include: Replacement of the existing control enclosure with a new enclosure, installation of a new control panel with updated controls, installation of new conduit with an intermediate junction box, replacement of the manual transfer switch and receptacle for portable back-up generator, and other necessary and incidental work. Questions are due to [radams@cityofmchenry. org] no later than 12:00 PM (CST) on July 22, 2022. Questions will be answered via addendum and posted on the City electronically no later than 4:00 PM (CST). The City of McHenry reserves the right to reject any or all proposals and to waive technicalities.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents