Similar Projects
OCC - Boiler Replacement
Alteration
Bidding
Omaha, NE 68110

Offstreet Parking District No. 2 - Structure No. 2
New Construction, Alteration - 182,459 SF
Results
La Vista, NE 68128

Replacement of Boiler System at Fire Station One for the City of Grand Island
Alteration
Results
Grand Island, NE

Boiler Retubing
Term Contract
Post-Bid
Offutt AFB, Offutt Air Force Base, NE 68113

City Hall Boiler Replacement
Alteration
Post-Bid
Kearney, NE 68847

East Campus Utility Plant General Installation Package for Boiler 6 and 7 Addition
Alteration
Results
Lincoln, NE 68503

J041--Mcquay Chiller Repair Services
Term Contract
Results
Omaha, NE 68105

Replace the Existing Boilers and Associated Mechanical and Electrical Support Systems
Alteration
Post-Bid
Hastings, NE 68901

NCCW - North Hall Chiller Replacement
Alteration
Post-Bid
York, NE 68467

Boiler Inspection and Repair - Fall Outage 2021
Alteration
Results
Grand Island, NE

NCYF Chiller Replacement
Alteration
Bidding
Omaha, NE 68110

Platte Generating Station Bottom Ash System Upgrades
Alteration
Post-Bid
Grand Island, NE

Ford Conservation Center Mechanical Revisions and Masonry Restoration Project
Alteration
Post-Bid
Lincoln, NE 68510

Emergency Boiler Maintenance
Term Contract, Alteration
Post-Bid
Hastings, NE

Last Updated 03/14/2022 02:05 PM
Project Title

Precipitator, Bottom Ash and Boiler Industrial Cleaning - Spring 2022 Outage

Physical Address View project details and contacts
City, State (County) Grand Island, NE   (Hall County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This scope will generally consist of grit blasting in the precipitator, detonation blasting in the superheat, rodding and vacuum in the superheat, high pressure water blasting in the Bottom Ash System and Spray Dry Absorber and vacuum cleaning throughout the power station.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents