Similar Projects
Great Miami River Recreation Bike Trail - State of Ohio
Addition, Infrastructure
Conception
Less than $500,000 est. value
Moraine, OH 45439

Park Center Drive Senior Residential Development
New Construction, Infrastructure - 71,500 SF
Conception
$64,800,000 est. value
Vandalia, OH 45414

Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

SR 134 - Bridge Preservation
Renovation, Infrastructure
Design
$530,000 est. value

I-75 - Major Reconstruction
Infrastructure
Bidding
$47,197,500 est. value
Dayton, Moraine, West Carrollton, OH 45426

Roadway Major Rehabilitation
Infrastructure
Bidding
$37,601,600 est. value
Moraine, OH 45439

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

Crack and Joint Sealant (MBE Only)
Term Contract
Post-Bid

Rosa Parks School Parking Lot Expansion
Results
Dayton, OH 45402

Bellefontaine Road Widening and Culvert Replacement
Results
Less than $900,000 est. value
Huber Heights, OH

Blosser Street Reconstruction Phase 1
Term Contract, Infrastructure
Bidding
$484,430 est. value
New Lebanon, OH 45345

Center Street Improvements Phase 4
Infrastructure
Post-Bid
$375,000 est. value
Farmersville, OH 45325

Belle Plain Park Parking Area
Results
Huber Heights, OH

Paving Program 2022 - Clayton Road
Infrastructure
Bidding
$145,574 est. value
New Lebanon, OH 45345

Mt. Crest Parking Lot & Sidewalk Replacement
Renovation
Post-Bid
Dayton, OH 45403

Last Updated 07/01/2022 06:05 AM
Project Title

Wright Factory Site Recreational Paths and Sitework

Physical Address View project details and contacts
City, State (County) Dayton, OH   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Description of Improvement: This project will install a concrete path to connect Frontage Street to the library, a walking path around Wright Factory Site, the grading, top soiling and seeding of Wright Factory Site, and the demolition of abandon items contained on site and items incidental there to.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents