Similar Projects
Boiler Replacement/ Camp Williams
Alteration
Conception
$444,400 est. value
Camp Douglas, WI

Install Dump Probes and High Water Probes at the Boiler Bldg. 112
Term Contract
Design
Milwaukee, WI 53295

Room 237 Mechanical Upgrades
Renovation
Sub-Bidding
$64,700 CJ est. value
Madison, WI 53715

Boiler Feed System Replacement at South Shore Water Reclamation Facility
Renovation
Sub-Bidding
$300,000 CJ est. value
Oak Creek, WI 53154

Hillcrest Elementary Cooler / Freezer
Post-Bid
Chippewa Falls, WI 54729

Boiler Replacement
Infrastructure
Post-Bid
Waukesha, WI 53188

Boiler and Cooling Tower Pumps Replacement
Results
Oshkosh, WI

Heating Distribution Upgrades - General
Results
$2,870,000 est. value
Madison, WI 53705

Courthouse Mechanical Equipment Upgrade
Alteration
Post-Bid
Crandon, WI

Green Bay Boiler Replacement
Results
$166,000 est. value
Madison, WI

Mechanical Demolition
Demolition
Post-Bid
Milwaukee, WI

Clinton Rose Senior Center Second Boiler Install and Exhaust Fans Replacement and Mcgovern Senior Center Exhaust Fans Replacement
Results
Milwaukee, WI 53212

Boiler Maintenance Services at Airport
Term Contract
Post-Bid
Green Bay, WI 54313

Arts Sculpture Laboratory - MEP
Results
$2,020,000 est. value
Whitewater, WI 53190

Le Phillips Library - Bp04 Drapery And Track
Renovation, Alteration
Post-Bid
Eau Claire, WI 54701

Last Updated 09/12/2022 06:02 PM
Project Title

Kitchen Renovation - MEP

Physical Address View project details and contacts
City, State (County) Neillsville, WI 54456   (Clark County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

This project is being let using a new single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. In general, the work consists of :This project will renovate the Armory kitchen, and food storage areas39 to meet current code requirements for use as a commercial kitchen space. This project would redesign40 the current kitchen space to incorporate current appliances and food serving tables, removing wood41 cabinetry, update ventilation, electrical and plumbing, provide fire suppression to cooking areas and42 replace flooring. Base Bids will be received as a single lump sum bid for: 3) Plumbing; 4) Mechanical (Heating, Ventilating, Air Conditioning); and 5) Electrical. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted.

Details

Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents