Similar Projects
Munchkin Extension/Multi Trail and Woodbine Improvement - CP0528 - City of Park City
Infrastructure
Conception
$1,858,825 CJ est. value
Park City, UT 84060

Munchkin Extension/Multi Trail and Woodbine Improvement - CP0528 - City of Park City
Infrastructure
Conception
$1,858,825 CJ est. value
Park City, UT 84060

Mountain Life Church Expansion
New Construction, Addition - 45,956 SF
Post-Bid
Park City, UT 84098

Asphalt Repair and Replacement - East 224 Connector/Fox Point
Post-Bid
Park City, UT

Moenave Trail Improvements
Results

2021 Summit County Overlay Projects
Results
$3,422,445 est. value
UT

Park City Mountain Resort Area Base Master Plan
New Construction, Infrastructure - 27,100 SF
Pending Verification
$76,300,000 CJ est. value
Park City, UT 84060

Park City Mountain Resort Area Base Master Plan
New Construction, Infrastructure - 27,100 SF
Pending Verification
$76,300,000 CJ est. value
Park City, UT 84060

Iron Horse Complete Street Improvements - CP0547 - City of Park City
Infrastructure
Conception
$2,500,000 CJ est. value
Park City, UT 84060

Crack Sealing and Seal Coating
Post-Bid
Park City, UT

2021 Pavement Management
Results
$960,635 est. value
Park City, UT

Sommet Blanc
New Construction, Infrastructure - 3,600 SF
Pending Verification
$18,000,000 CJ est. value
Park City, UT 84060

SR 248/US 40 Park and Ride Lot - CP0411 - City of Park City
Infrastructure
Conception
$2,700,000 CJ est. value
Park City, UT 84060

South Summit School District Asphalt Maintenance 2021
Infrastructure
Post-Bid
Kamas, UT

S Roadway Improvements
Results

Last Updated 08/29/2022 03:35 PM
Project Title

Harmons at the Junction

Physical Address View project details and contacts
City, State (County) Park City, UT 84098   (Summit County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the demolition of a 54,000 square-foot commercial building and the new construction of a 76,000 square-foot grocery store. As of August 29, 2022, design is underway. The project is on the September 27, 2022 Snyderville Basin Planning Commission meeting agenda and will go to City Council if approved. Information regarding the selection of a general contractor has not been provided. A timeline for construction has not been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

2 Stories Above Grade, 76,000 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents