Last Updated | 12/29/2022 05:05 PM |
Project Title | RFP D/B - USACE SPK Design Build Construction - Ground Based Strategic Deterrent (GBSD) Technology and Collaboration Center (TACC) |
Physical Address | View project details and contacts |
City, State (County) | Hill Air Force Base, UT 84056 (Davis County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Design-Build Firm to Subcontract, Competitive Bids |
Project Status | Bidding, Request for Qualifications, Construction start expected May 2023 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $100,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The scope of this project for Design-Build (DB) construction services is to construct a Ground Based Strategic Deterrent (GBSD) Technology and Collaboration Center (TACC) to provide a mix of secure and unclassified office, technical, and collaboration areas sized to accommodate various workgroups and teams necessary to develop and sustain the next generation Intercontinental Ballistic Missile (ICBM) weapon system. New construction will have armor-plated concrete footings and foundation, structural steel frame, insulated walls and roof, lightning protection, fire detection/suppression, and intrusion detection. Finished ceiling heights will be typical for administrative and collaboration areas. Designated areas will be constructed to ICD/ICS 705 technical standards. Secure office and some technical areas will have a raised floor system necessary for distributing and flexibility in reconfiguring multiple systems. The project includes a ground-level parking area with curbs and lighting to support both office and collaboration areas, all supporting utilities such as water, storm water and sanitary sewer, and communications connections, plus roadway improvements with curb, gutter, and sidewalks necessary to integrate the facility into the base system. In accordance with DFARS 236.204(ii) the magnitude of construction is estimated to be between $25,000,000 and $100,000,000.BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml solNo=W9123822R0050' to obtain more details.* *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Project no-W91238-21-F-0014 |
||
Details | 1 Story Above Grade, 78,458 SF.
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |