Similar Projects
Playground Equipment for Cherry Hill and Ford Woods
Bidding
Dearborn, MI 48124

Kennedy Park Expansion
Addition
Bidding
Detroit, MI

Turf Field Construction and Track Reconstruction
Post-Bid
New Boston, MI

Design and Build Aquatic Play Area
Post-Bid
Southgate, MI 48195

Bird Elementary School Paving Expansion and P-CEP JV Track and Field Replacement Project
Results
Plymouth, MI

Practice Football Field Improvements
Results
Dearborn, MI

Park Promenade Development
New Construction - 165,000 SF
Construction
$10,000,000 CJ est. value
Woodhaven, MI 48183

Early Childhood Education Center
New Construction - 58,000 SF
Construction
$15,000,000 est. value
Detroit, MI

French Landing Park Improvements
Bidding
Belleville, MI 48111

City of Melvindale Playground Design and Build Out
Post-Bid
Melvindale, MI 48122

Palmer Park Multi-Sports Hub
Term Contract
Results
Detroit, MI

Playground Equipment Relocations
Post-Bid
Westland, MI 48185

Laker Park Renovations
Term Contract
Results
Detroit, MI 48226

Park Drinking Fountains
Post-Bid
Taylor, MI

Rouge Park Renovations (Brennan Splash Padl)
Term Contract
Results
Detroit, MI

Last Updated 06/24/2020 02:23 PM
Project Title

Freshman Baseball Renovation 2020

Physical Address View project details and contacts
City, State (County) Northville, MI   (Wayne County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Requirements of items included under General Work to be completed by all contractors. 2. Provide engineering and layout as required to complete this work. Layout points of reference will be provided prior to commencement of work. 3. Include all required permits and bonds. 4. Perform earthwork as necessary to establish grades, and site grading to within 0.1 feet of the sub-grades indicated. 5. Coordinate work with other trades on site. 6. Contractor shall be aware that this scope of work will require multiple mobilizations and installation times. 7. Removal of all existing fence and footings as indicated on drawings. Work includes necessary backfill from footing removal. 8. Furnish and install new 8’ galvanzied fence and gates around baseball field. 9. Furnish and install new black vinyl chainlink fence and windscreen around dugouts. 10. Furnish and install new protective fence cap. 11. Repairing of surfaces in-kind damaged from chainlink fence/footing removal and installation shall be included with this scope. 12. Strict enforcement of this contractor’s requirement to provide timely clean-up, removal and disposal of all rubbish and debris generated by this trade during the work. Maintain a clean condition at all areas on site and free from dirt, mud, and gravel

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents