Similar Projects
South Aspen Avenue Mixed Use Project Development
New Construction, Infrastructure - 260,000 SF
Conception
$132,000,000 CJ est. value
Broken Arrow, OK 74011

LaFortune Park Splash Pad - Tulsa County
Infrastructure
Conception
$550,000 CJ est. value
Tulsa, OK 74135

Pavement Rehabilitation
Infrastructure
Design
$22,434,951 CJ est. value
Tulsa, OK 74110

I-44 - Utilities
Infrastructure
Design
$2,013,883 CJ est. value
Tulsa, OK 74145

Portland Cement Concrete Street Repairs
Infrastructure
Bidding
$2,000,000 CJ est. value
Broken Arrow, OK 74012

RFQ Construction Manager at Risk - Case Tennis Center at LaFortune Park
New Construction, Infrastructure
Bidding
$700,000 CJ est. value
Tulsa, OK 74135

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Kum & Go #2362 / Tulsa
New Construction, Infrastructure - 5,620 SF
Post-Bid
$2,000,000 CJ est. value
Tulsa, OK 74133

Sidewalk and Curb Ramp Construction for CBDG / HUD Grant
Infrastructure
Results
$235,173 CJ est. value
Tulsa, OK 74103

138 FW Intel Vault Upgrade
Renovation
Results
$100,000 to $250,000 est. value
Tulsa, OK 74115

Jenks Speech Therapy
New Construction, Infrastructure - 6,080 SF
Construction
$1,300,000 CJ est. value
Jenks, OK 74037

Uncle Julio's / Tulsa
New Construction, Infrastructure - 7,693 SF
Construction
$1,752,382 CJ est. value
Tulsa, OK 74133

WeConnect Office Expansion
Demolition, Renovation, Infrastructure - 866 SF
Pending Verification
$40,000 CJ est. value
Tulsa, OK 74137

The Enclave at Southern Trails
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Broken Arrow, OK 74011

Brentwood - Concrete Panel Replacement - City of Broken Arrow
Infrastructure
Conception
$1,000,000 CJ est. value
Broken Arrow, OK 74012

Last Updated 01/24/2023 11:36 AM
Project Title

Small Arms Range (TANG)

Physical Address View project details and contacts
City, State (County) Tulsa, OK 74115   (Tulsa County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Military Facility, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $6,500,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Bid Packages: #1 Demolition -$78,303.00 #2 Earthwork - $98,945.00 #3 Site Utilities - $247,429.00 #4 Concrete - $515,061.00 #5 Masonry - $98,426.00 #6 Structural & Misc Steel - $94,573.00 #7 Metal Roofing & Wall Panels - $95,926.00 #8 Rough Carpentry - $14,426.00 #9 Framing, Drywall and Ceilings - $70,754.00 #10 Millwork - $29,804.00 #11 Hollow Metal Doors & Frames - $$33,503.00 #12 Glass & Glazing - $4,800.00 #13 Painting - $13,946.00 #14 Flooring - $10,765.00 #15 Specialties - $10,765.00 #16 Signage - $1,581.00 #17 Loading Dock Equipment - $9,996.00 #18 Truck Scales - $106,676.00 #19 Fire Suppression - $5,431.00 #20 Plumbing - $96,339.00 #21 HVAC - $85,300.00 #22 Electrical - $155,901.00 #23 Modular Small Arms Range - $4,533,721.00

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents