Similar Projects
Mission Hill Park Phase 2 - City of New Braunfels
New Construction, Infrastructure
Conception
$6,700,000 CJ est. value
New Braunfels, TX 78132

Mission Hill Park Phase 2 - City of New Braunfels
New Construction, Infrastructure
Conception
$6,700,000 CJ est. value
New Braunfels, TX 78132

Bluebonnet Dodge Commercial Truck Center
New Construction - 1,977 SF
Design
$300,000 est. value
New Braunfels, TX 78130

Bluebonnet Chrysler Dodge Ram Dealership
New Construction, Infrastructure - 316,824 SF
Design
$18,000,000 CJ est. value
New Braunfels, TX 78130

Public Health/Emergency Operations Center
New Construction, Infrastructure
Bidding
$23,218,973 CJ est. value
New Braunfels, TX 78130

Navarro Subdivision Unit 7 Public Water, Wastewater, Paving and Drainage Improvements and Navarro Subdivision Unit 7 Private Grading Improvements
Infrastructure
Post-Bid
$365,000 est. value
New Braunfels, TX

Navarro Subdivision Unit 7 Public Water, Wastewater, Paving and Drainage Improvements and Navarro Subdivision Unit 7 Private Grading Improvements
Infrastructure
Post-Bid
$365,000 est. value
New Braunfels, TX

Construction of Fire Station #7 and Fire Training Complex
New Construction, Infrastructure - 22,600 SF
Results
$22,011,671 CJ est. value
New Braunfels, TX 78130

IH 35 - Crack Seal
Infrastructure
Results
$295,468 est. value
New Braunfels, TX 78133

SH 46 - Widen Road - Add Lanes
Infrastructure
Construction
$59,488,630 CJ est. value
Canyon Lake, TX 78132

SH 46 - Widen Road - Add Lanes
Infrastructure
Construction
$59,488,630 CJ est. value
Canyon Lake, TX 78132

New Braunfels - Southeast Side Branch Library
Addition, Infrastructure - 23,000 SF
Pending Verification
$29,000,000 CJ est. value
New Braunfels, TX 78130

New Braunfels - Southeast Side Branch Library
Addition, Infrastructure - 23,000 SF
Pending Verification
$29,000,000 CJ est. value
New Braunfels, TX 78130

South Kowald Lane from FM 1101 to I-35 - City of New Braunfels
Infrastructure
Conception
$8,400,000 CJ est. value
New Braunfels, TX 78130

Legacy Heights Amenity Lot
New Construction, Infrastructure - 137,828 SF
Design
$1,200,000 est. value
New Braunfels, TX

Last Updated 02/20/2024 09:40 AM
Project Title

O'Reilly Auto Parts (BVE) / Bulverde

Physical Address View project details and contacts
City, State (County) Bulverde, TX 78070   (Comal County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

*The owner requests that all subcontractor / supplier inquiries be directed to the GC Bidder.

Details

1 Story Above Grade, 7,225 SF.
Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment.
Division 12 - Furnishings, Office Accessories, Rugs and Mats, Office Furniture, Interior Planters and Artificial Plants.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging.
Division 28 - Electronic Safety and Security, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Parking Bumpers, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Sanitary Sewerage Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents