Similar Projects
Chlorination Updates - Hancock Well and Oak Street Well Projects
Bidding
Midvale, Sandy, UT 84094

Purchase and Deliver Well Surface and Intermediate Casing Forge
Term Contract
Post-Bid
Salt Lake City, UT 84112

Water Treatment- Green Well
Post-Bid
Riverton, UT

Well No. 8 Chlorinator Replacement
Results
Salt Lake City, UT 84119

Refurbishment and Upgrade of Well #4
Results
Less than $100,000 est. value
West Jordan, UT

Drilling Rig and Services for Paradox Basin
Post-Bid
Salt Lake City, UT

Murray Park Well
Results
Less than $1,257,651 est. value
Murray, UT 84107

Walker Lane Well Rehabilitation
Post-Bid
Less than $2,000,000 est. value
Holladay, UT 84117

Kenilworth RR 1-A Well Plug
Results
$50,000 to $60,000 est. value
Salt Lake City, UT 84114

Well Plugging
Post-Bid
Salt Lake City, UT

Flat Iron Mesa Well House Construction Project
Results
Sandy, UT 84070

Well in Paradox Basin
Term Contract
Results
Salt Lake City, UT 84112

Pump-House Parts and Repairs
Term Contract
Results
Salt Lake City, UT 84190

Decker Main WWPS Pump Replacement - Phase 2
Results
Less than $450,000 est. value
West Valley City, UT 84119

Well Site Housing Units
Results
Salt Lake City, UT 84112

Last Updated 12/28/2020 12:43 PM
Project Title

University of Utah Category 4 Inspection Drill Pipe, Hwdp, Collars, Stabilizers

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Vendor will provide CAT-4 Inspections of heavy weight drill pipe (HWDP), drill collars, stabilizers, subs, and related equipment for a well that is designated as 16A(78)-32. The site is located approximately 10 miles north of Milford Utah (Attachment A). This is a geothermal well and the static bottom hole temperature at total depth (10,938 ft MD, 8,540 ft TVD) is up to 450°F (Attachent B). This well will be used for Enhanced Geothermal Systems testing.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 31 - Earthwork, Tunnel Excavation, Tunnel Excavation by Drilling and Blasting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 41 - Material Processing and Handling Equipment, Machining Equipment, Drilling Equipment.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents