Similar Projects
Last Updated | 09/28/2023 01:08 PM |
Project Title | Augusta St. Pedestrian Hybrid Beacon |
Physical Address | View project details and contacts |
City, State (County) | Greenville, SC 29605 (Greenville County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected December 2023 |
Bids Due | View project details and contacts |
Estimated Value | $250,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The City of Greenville is requesting sealed bids from qualified contractors for the installation of a pedestrian hybrid beacon at the intersection of Augusta Street and Field Street. The scope of work will consist of the installation of mast arm signal poles and signal equipment, a landscaped pedestrian refuge on Augusta Street, and a concrete island on Augusta Street. The construction limits of this project extend from 154 Augusta Street to Bradshaw Street. The project will consist of striping, curb and gutter, concrete sidewalk, landscaping, installation of mast arm signal poles and pedestrian poles, signal installation, and all related traffic control as shown in the construction plans. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |