Similar Projects
Millspring Village Subdivision
New Construction, Infrastructure
Conception
$44,000,000 CJ est. value
Greenville, SC 29617

Zoo Walkway Repaving - City of Greenville
Infrastructure
Conception
$366,500 CJ est. value
Greenville, SC 29601

The Alliance
New Construction, Infrastructure - 33,000 SF
Design
$15,000,000 CJ est. value
Greenville, SC 29607

The Alliance
New Construction, Infrastructure - 33,000 SF
Design
$15,000,000 CJ est. value
Greenville, SC 29607

Enhancement - Greenville County
Infrastructure
Bidding
$2,599,521 CJ est. value
Taylors, SC 29687

Enhancement - Greenville County
Infrastructure
Bidding
$2,599,521 CJ est. value
Taylors, SC 29687

Inland Port Greer, East and West Container Yard Expansion
Infrastructure
Post-Bid
$600,000 CJ est. value
Greer, SC 29651

Inland Port Greer, East and West Container Yard Expansion
Infrastructure
Post-Bid
$600,000 CJ est. value
Greer, SC 29651

Safety Improvements - US 25
Infrastructure
Results
SC

Bethany Tank Water Supply Improvements
Infrastructure
Results
$995,379 CJ est. value
Laurens, SC 29360

Leo Living Cottages Multi Residential
New Construction, Infrastructure - 3,000 SF
Construction
$125,000,000 CJ est. value
Greer, SC 29651

BridgeWay Station Mixed-Use / Mauldin
New Construction, Infrastructure - 300,000 SF
Construction
$100,000,000 CJ est. value
Simpsonville, SC 29681

Parkers Summit Subdivision
New Construction, Infrastructure
Pending Verification
$66,000,000 CJ est. value
Greenville, SC 29601

Mauldin City Center Mixed-Use (Maverick Yards)
New Construction, Infrastructure
Pending Verification
$18,500,000 CJ est. value
Mauldin, SC 29662

Laurens Road Swamp Rabbit Trail (SRT) - City of Greenville
Infrastructure
Conception
$1,500,000 est. value
Greenville, SC 29613

Last Updated 09/28/2023 01:08 PM
Project Title

Augusta St. Pedestrian Hybrid Beacon

Physical Address View project details and contacts
City, State (County) Greenville, SC 29605   (Greenville County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Greenville is requesting sealed bids from qualified contractors for the installation of a pedestrian hybrid beacon at the intersection of Augusta Street and Field Street. The scope of work will consist of the installation of mast arm signal poles and signal equipment, a landscaped pedestrian refuge on Augusta Street, and a concrete island on Augusta Street. The construction limits of this project extend from 154 Augusta Street to Bradshaw Street. The project will consist of striping, curb and gutter, concrete sidewalk, landscaping, installation of mast arm signal poles and pedestrian poles, signal installation, and all related traffic control as shown in the construction plans.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents