Similar Projects
Eagles Nest Senior Care
New Construction, Infrastructure - 94,822 SF
Conception
$25,300,000 CJ est. value
Milton, DE 19968

Eagles Nest Senior Care
New Construction, Infrastructure - 94,822 SF
Conception
$25,300,000 CJ est. value
Milton, DE 19968

Royal Farms #428 / Milton
New Construction, Infrastructure - 5,100 SF
Design
$1,400,000 CJ est. value
Milton, DE 19968

Royal Farms #428 / Milton
New Construction, Infrastructure - 5,100 SF
Design
$1,400,000 CJ est. value
Milton, DE 19968

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

White Farm Wastewater Treatment Facility - Town of Millsboro
New Construction, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Millsboro, DE 19966

Soroptimist Park Parking Lot Paving
Infrastructure
Results
Seaford, DE

Delaware Veterans Home Dental Suite Addition and Renovations
Addition, Demolition, Renovation, Infrastructure - 7,500 SF
Results
$249,500 CJ est. value
Milford, DE 19963

Turnberry - Unity Branch Subdivision
New Construction, Infrastructure
Construction
$32,000,000 CJ est. value
Harbeson, DE 19951

Dairy Queen At Georgetown Plaza
New Construction, Infrastructure - 2,279 SF
Construction
$700,000 CJ est. value
Georgetown, DE 19947

Black Hog Village Retail
New Construction, Infrastructure - 21,818 SF
Pending Verification
$4,000,000 CJ est. value
Lewes, DE 19958

Black Hog Village Retail
New Construction, Infrastructure - 21,818 SF
Pending Verification
$4,000,000 CJ est. value
Lewes, DE 19958

Stormwater Basin #40 - City Of Rehoboth Beach
Infrastructure
Conception
$1,430,000 est. value
Rehoboth Beach, DE

Holiday Inn Express at Georgetown Villages Phase 1
New Construction, Infrastructure - 16,000 SF
Design
$4,800,000 CJ est. value
Georgetown, DE 19947

Construction of the 7th Street Water Main Replacement
Infrastructure
Post-Bid
$300,000 est. value
Laurel, DE 19956

Last Updated 10/12/2023 11:33 PM
Project Title

US 113 at SR 20 Grade Separated Intersection

Physical Address View project details and contacts
City, State (County) Millsboro, DE 19966   (Sussex County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $25,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The improvements consist of furnishing all labor and materials for this project. The scope consists of a grade separation at the US 113/ SR 20 intersection located just north of Millsboro, Delaware. The grade separation includes a partial cloverleaf configuration with loop ramps in the northeast and southwest quadrants with signals at the ramp terminals, a bridge structure, drainage improvements, and multimodal facilities. Also, unsignalized median crossovers will be removed on US 113 south of the US 113/ SR 20 intersection within the project's limits. Follow other incidental construction in accordance with the location, notes and details shown on the plans, and as directed by the Engineer. Pre-bid meeting: no Ojt trainees: two (2) see prospective bidder's notes and posted ojt manual for details. Location: sussex county These improvements are more specifically shown on the location map(s) of the attached plans. Completion time: all work on this contract must be complete within 597 calendar days. Extensions of contract time due to weather are specified in the standard specifications section 108.7f, weather days. It is estimated a notice to proceed is issued such that work starts on or about January 2, 2024. Question Deadline 10/18/2023 at 2:00 PM ET QUESTIONS: E-MAIL TO; dot-ask@delaware.gov Questions regarding this project are to be e-mailed to the above address no less than six business days prior to the bid opening date in order to receive a posted response. Surety bond - each proposal must be accompanied by a deposit of either surety bond or security for a sum equal to at least 10% of the amount bid. Performance-based rating system - 29 del.C. 6962 (c)(12)(a) requires deldot to include a performance-based rating system for contractors. The performance rating for each contractor shall be used as a prequalification to bid at the time of bid. Refer to 'general notices' for details. DEDOT - US 113 at SR 20 Grade Separated Intersection

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents